BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Perry Township, Ohio. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Intends to contract for Professional Engineering Services related to the design of the Tam OShanter Park Roadway Improvements off Hills and Dales Road NW in Jackson Township This project includes the design for the reorientation of the existing park drive that runs E/W of the clubhouse and the design for the reconstruction (expansion and reduction) of three parking lots near the existing entrance of the park. The project site is located at Tam O'Shanter Park at 5055 Hills and Dales Road NW, Canton, OH. As required by the Ohio Revised Code, Section 153.67-51, responding firms will be evaluated and ranked in order of their qualifications. Following this evaluation, the Stark County Park District will enter into contract negotiations with the most highly ranked firm. 1. Park Drive - East: Redevelop the existing entrance on Hills and Dales Road NW and extend the park drive westward to Parking Lot C where a turn-around will be integrated into the parking lot design. The proposed two-way park drive will be approximately 1,000 LF in total length with approximately 600 LF of the drive realigned; 2. Clubhouse Parking Lot (A): Redevelop and expand the two-bay parking lot located southeast of the existing clubhouse (approximately 80-car with drop-off area and 150 LF of two-way drive); 3. Trailhead Parking Lot (B): Redevelop and reduce the two-bay parking lot located south of the clubhouse (approximately 120-car and 50 LF of two-way drive); 4. Parking Lot (C): Redevelop the single-bay parking lot located adjacent to an existing shelter and north of the proposed Great Lawn (approximately 10-car and 50 LF of two-way drive). Note that this parking area must provide an opportunity for vehicles to turn around as this will be the end of the park drive until the next phase of work is constructed. Additional trail improvement design will include a combination of paved, crushed limestone, boardwalk, and mowed trails, totaling approximately 6,000LF. Shortlist Confirmed.

Final Planning

Roads / Highways

$1,110,993.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
62
Bidding Soon
1,104
All Active Projects
425
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2021

February 1, 2022

img_map_placeholder

To Be Determined, Perry Township, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.