BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and asbestos abatement for a municipal facility in San Pablo, California. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.

Demo and Abatement of Physical Science and Biological Science Buildings and other Structures Contra Costa College 2600 Mission Bell Drive, San Pablo, CA 94806 NOTICE IS HEREBY GIVEN that the Governing Board of the Contra Costa Community College District (District), Martinez, California, will receive sealed bid proposals for the furnishing of all labor, materials, equipment, transportation and services for the construction of the project entitled C-4016, Inc. 3, Demo and Abatement of Physical Science and Biological Science Buildings and other Structures. Construction Cost Estimate (Range): $1,800,000. to $2,100,000. License Required: California B - General Building; or California A - General Engineering. Scope: In general, the Work consists of the following, but not limited to: installation of temporary facilities, safety signage, wayfinding signage, project temporary fencing, and lighting; storm water pollution prevention; abatement of hazardous materials; demolition and removal of buildings, structures, foundations, hardscape, landscape and a foundation for a pedestrian bridge, above ground and below ground utilities; re-grading; hydroseeding and all related work. All questions related to this project must be in writing and are directed to: Ben Cayabyab, Contracts Manager Contra Costa Community College District 500 Court St., Martinez, CA 94553 Email: bcayabyab@4cd.edu Construction Cost Estimate (Range): $1,800,000. to $2,100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work Starts on Site - February 1, 2022 200 Calendar Days from Notice to Proceed (NTP) to Substantial Completion (SC) 35 Calendar Days between SC and Final Completion (FC)

Award

Municipal

$1,049,281.00

Public - County

Asbestos Abatement, Demolition, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
93
Bidding Soon
1,832
All Active Projects
682
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

February 1, 2022

img_map_placeholder

2600 Mission Bell Dr, San Pablo, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.