BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Elwood, Nebraska. Completed plans call for site work for a playground / park / athletic field.

CONSTRUCTION LIMITS AND STORAGE A. Refer to the Drawings for the location of the Project at Johnson Lake SRA in Elwood, Nebraska. B. The Independent Contractor shall limit his construction activities to the immediate construction area and to approved storage areas on the Site. C. Access to the remainder of the Site for State employees or their designated representative shall be maintained during construction. D. The Independent Contractor shall provide barricades, safety or warning devices, signs and warning lights required for the protection of employees, the public and property. E. The area drives and parking lots may be used for material and equipment deliveries and access, if and only if, the Independent Contractor suitably protects the areas from damage, does not interfere with use of SRA outside the construction area, and maintains the access routes reasonably clean as determined by the Owner. In accordance with Neb. Rev. Stat. 72-803 (4),bidder's proposal shall be submitted on a form supplied with the Bidding Documents and must be accompanied by a certified check, cashier's check, or Bid Bond in the amount of 5% of the total Bid, made payable to the Nebraska Game and Parks Commission as Bid security. Bid security shall be considered as liquidated damages and forfeited to the Nebraska Game and Parks Commission if the Bidder's proposal is accepted and the Bidder fails to execute the contract and provide the required bond(s) and insurance specified. No Bid Bond will be required if the total project cost is less than $50,000.00 In accordance with Neb. Rev. Stat. 52-118, a contractor is required to furnish a Labor and Material Payment Bond in the full amount of the contract price if at the time of the contract award the total project cost exceeds $15,000 The Nebraska Game and Parks Commission reserve the right to accept or reject any or all Bids and to waive any or all informalities or irregularities. The work is required to be complete and ready for final payment by May 1, 2022.

Award

Playgrounds / Parks / Athletic Fields

$275,260.00

Public - State/Provincial

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
7
Bidding Soon
82
All Active Projects
42
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2021

December 31, 2021

img_map_placeholder

1 Drive 25A, Elwood, NE

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.