BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, remodeling, renovation and addition to a mixed-use development in Cedar City, Utah. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the remodel of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The purpose of this RFP is to solicit competitive proposals from qualified firms for a Construction Manager (at risk)/General Contractor (CM/GC). Firms must be licensed and certified as applicable in the State of Utah, to construct additions to the Cedar Middle School and additions and remodel to Canyon View Middle School, and remodel to Cedar High School Science Wing per design from Naylor Wentworth Lund Architects. The CM/GC will work closely with the Iron County School District's Director of Facilities and Naylor Wentworth Lund Architects, through the design phase, providing cost estimates, schedules and feedback of design details, phasing, and availability of materials selected. CM/GC will also monitor the bid climate and recommend the optimal bidding schedule to the design team. Iron County School District reserves the right to accept or reject any or all proposals and to waive any formality, informality, irregularity or technicality in any proposal. The District also reserves the right to call for new bids if their interests or convenience is better served by such course. If any portion of the above terms are not acceptable it is the bidder's responsibility to so state in writing. Any and all bids are subject to the approval of the school district business administrator and the board of education. Q & A deadline: Dec 07, 2021 5:00 PM MT Project Scope The Iron County School District intends to add a "Performing Arts", as well as, "General Classroom" additions to both Cedar Middle School and Canyon View Middle School. The approximate square footage of these new additions is approximately (30,000 ft2) to Cedar Middle School and (20,000 ft2) to Canyon View Middle School.There will also be approximately (7,500 ft2) of remodel to the "Science Wing" of Canyon View Middle School. The "Science Wing" of CHS is approximately (13,000 ft2) of remodel. It is anticipated that the projects will begin construction approximately March 2022 with anticipated occupancy of all projects no later than December 2023. Please see the attached architectural floorplans of the schools and the proposed additions and remodels.

Post-Bid

Educational

$22,000,000.00

Public - County

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
5
Bidding Soon
112
All Active Projects
42
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

July 25, 2022

img_map_placeholder

Multiple Locations, Cedar City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.