BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2021 at 7:00 PM

Updated April 23, 2025

Site work and paving for a mixed-use development in Foster City, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Project consists of: Installing synthetic turf on the play area. As security for its Bid, each bidder shall provide with its Bid form - bid bond issued by an admitted surety insurer on the form provided by the District, - cash, or - cashier's check or a certified check, drawn to the order of the San Mateo-Foster City School District, in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. The successful Bidder and its subcontractors shalt pay all workers on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are on file with the District and are available to any interested party on request or at websitee. Bidders and Bidders' subcontractors shall comply with the registration and qualification requirements pursuant to sections 1725.5 and 1771.1 of the California Labor Code. The District's Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. PROJECT SCOPE OF WORK INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: DEMOUTION OF EXISTING NATURAL GRASS FIELD, CONSTRUCTION OF NEW MULTIPURPOSE SYNTHETIC TURF FIELD AND ADJACENT LANDSCAPING, UNDERGROUND UTILITY IMPROVEMENTS, HARDSCAPÊ INSTALLATION, FENONG, CHAIN LINK BACKSTOP, AND ADA IMPROVEMENTS TO THE EXISTING PARKING LOT

Award

Educational

$1,250,321.00

Public - City

Paving, Site Work

21

15

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
498
Active Projects
232
Bidding Soon
2,813
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2021

February 7, 2022

Project location map

461 Beach Park Blvd, Foster City, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.