BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Delmar, Delaware. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of March 8, 2022 this RFP has not yet been awarded. A timeline for award has not yet been established.** The Delaware Department of Transportation (DelDOT) is accepting Statements of Qualifications (SOQs) in response to this Request for Proposal (RFP) from qualified firms interested in providing CM/GC services to DelDOT for this project. The CM/GC process is a unique method used to accelerate project delivery. In the CM/GC process DelDOT hires an experienced, qualified contractor to provide feedback during the design phase before the start of construction. Questions regarding this project are to be e-mailed to dot-ask@delaware.gov no less than six business days prior to the proposal opening date in order to receive a response. Please include CM/GC in the subject line. Responses to inquiries are posted on-line at bids.delaware.gov. Any changes, clarifications, or interpretations of this RFP that affect or change its requirements will be issued by DelDOT to the Project Bid Web Site in the form of Addenda or in response to questions. Responses in any other form, including oral statements, will not be binding on DelDOT and should not be relied upon in preparing the Statement of Qualification (SOQ). DEDOT - RFP Construction Manager at Risk - CM/GC Services Replacement of Bridge 3-437 on SR 54 Lighthouse Road Commitment to the identified Disadvantaged Business Enterprise (DBE) participation goal. DBE participation is anticipated to be between 10% and 20%, although the final determination will be made at the Final Plan (95%) milestone. Proposed Construction Price (PCP) Finalization January 2024 (estimated) Construction Letting (if no PCP agreement) February 2024 (estimated) Construction Fall 2024 to Fall 2025 (estimated) The estimated preliminary construction cost for the project is $19,000,000.00

Post-Bid

Bridges / Tunnels

$19,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
118
Bidding Soon
1,304
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

April 8, 2022

Project location map

DE-54, Delmar, DE


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.