Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a library in Alliance, Nebraska. Completed plans call for the renovation of a library.

The ALLIANCE PUBLIC LIBRARY- HVAC SYSTEMS REPLACEMENT involves a variety of mechanical and electrical work. The project modifies, upgrades, and replaces mechanical systems that are original to the facility's late 1998 construction. Systems to be replaced include; the chiller and chilled water system, fan-powered VAV boxes, and the facility's DDC control system. Modifications include changes to the heating hot water piping, adding additional diffusers to existing ductwork, re-motoring of the existing air handlers and return fans, heating hot water pump replacement, adding Variable Frequency Drives (VFD's), and other items. Critical issues of this project involve maintaining the continued operation of the library and community college, along with minimal disruption of interior temperature conditions during the replacement of the systems and equipment. Disruption of library and community college operations will be limited to temporary closure of individual rooms, with those closures being coordinated in advance with the library/community college. The completion of all work is to occur by May 21st, 2023. The spring final completion date is intended to accommodate for and allow contractor flexibility for the extended lead times currently occurring for mechanical and electrical equipment. Minimal disruption of the interior temperature during operating hours will be achieved by scheduling the modification/removal/replacement of the mechanical systems during periods when those systems are not required. Removal and replacement of the chilled water system will occur during the Fall/Winter/Spring. Work on the heating system is less extensive and complex, such that down times can be limited. However, the major work on the heating system would still be done during the Fall or Spring, during mild conditions such that temporary heat is minimally required or not needed. Disruptions of individual spaces, caused by work such as VAV box replacement, control system replacement, etc., will be coordinated with the Library/Community College.

Award

Library

$1,490,000.00

Public - City

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2022

September 5, 2022

Project location map

1750 Sweetwater Ave, Alliance, NE

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed