BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, remodeling and renovation of an educational facility in San Bruno, California. Completed plans call for the remodel of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Construction of a new Ceramics Kiln Garage, Installation of a new elevator, Exterior site work on South side of building, Remodel/Refurbish Choral, Band & Gallery Rooms, Comprehensive Restroom remodeling for ADA compliance, Mechanical & Network Upgrades, Theater smoke hatch, main drape and fire curtain replacement and possible rigging replacement. o New Kiln Garage. 1 story CMU structure with equipment @ east yard o New Elevator. 3 story in Courtyard. o Abate Courtyard Window Sealant. (Alternate #1) o Sitework. Fill in Loading dock. Create patio at Choral & pathway to Kiln Garage & Bus Stop. Add Accessible Parking. o Restroom/Custodial Remodeling. Remodel 3 sets of Multi-User Restrooms/Custodial Closets (demo previously performed by others). o Choral. Demo tiered floor/replace with new slab. Remodeling at rear entry, AV installations, finishes, etc. o Band. Demo cabinetry, if any (flooring demolished by others). Install new cabinets, flooring, projector, finishes etc. HVAC. o Replace Air Handler & Exhaust Fan - 1 st Fl. Central Plant o Replace 8 Fan Coil Units - 1st Fl. o Replace Air Handler Unit/Rooftop Enclosure - 2 nd Fl./Roof o Replace Air Handler Unit - 2 nd Fl. (Alternate #3) o Replace Sump Pumps - Sculpture, 1st Fl. o Restroom/Custodial Remodeling. Remodel 3 sets of Single-User Restrooms/Custodial closets (demo & construction in this contract). o Complete all Spring '22 Work Gallery. o Replace lighting/controls, paint o Theater. o Replace 2 smoke vents o Abate/replace Fire Curtain o Replace Main Drape o Replace Rigging (Alternate #2) Notice to Proceed - Construction Start: Monday, February 14, 2022 (approx.) Substantial Completion Milestone: January 17, 2023 (approx.) Final Completion (complete Close-Out): 45 days after Substantial Completion This project is subject to the terms of the Program Stabilization Agreement (PLA) Executed between the District and the San Mateo County Buildings and Trades Council. Copies of the PLA are available on the Web. Interested bidders are advised to arrive early and park in Lot E. Parking passes are not required. The conference will include a project overview and site walk. Doors will be locked 15 minutes after the start time of each conference The successful Bidder must comply with all prevailing wage laws applicable to the Project, and related requirements contained in the Contract Documents. Prevailing Wage Determinations are on file at the District, available at CA Department of Industrial Relations website Online Q&A Yes Q&A Deadline 12/13/2021 5:00 PM (PST) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% License Requirements B The Work generally consists of demolition, minor abatement, framing, finishes, mechanical, electrical, plumbing and equipment installs to remodel restrooms, specialty classrooms and theater. A new elevator, kiln building, mechanical equipment replacements and network cabling upgrades are included in the scope. Sitework and foundations for new walkways, patios, the new elevator and a new single story concrete block kiln building.

Award

Educational

$9,472,401.00

Public - County

Remodeling, Renovation, Site Work

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
175
Bidding Soon
3,168
All Active Projects
1,314
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 21, 2021

February 14, 2022

img_map_placeholder

3300 College Dr, San Bruno, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.