BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and outdoor lighting for a mixed-use development in Bakersfield, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work to be performed consists, in general, of widening the east side of Calloway Drive between Lake Superior Drive and Norris Road. Existing traffic striping and pavement markings shall be modified on the east side of the roadway, from Galleria Way to approximately 440 feet north of Norris Road. The street widening includes, removal of existing concrete curbs, stumps, old-topped utility pole; removing existing trees and shrubs; modifying existing traffic signal and lighting system on the southeast corner of Calloway Drive and Norris Road; modifying existing landscaping and landscape irrigation systems; modifying existing fencing; resetting mailboxes; sawcutting and removing existing hot mix asphalt; roadway excavation; clearing and grubbing; relocating existing roadside signs; constructing type "B" curb and gutter; constructing drive approaches and tie-ins; installing sidewalk and ADA Case A curb ramp; constructing type "A" hot mix asphalt pavement; modifying vehicle detection loops. Liquidated Damages $1,000 per day Project Duration 35 working days License Requirements Class A The Contractor shall diligently prosecute the work to completion before the expiration of 35 working days.

Award

Roads / Highways

$469,919.00

Public - City

Outdoor Lighting, Paving, Site Work

14

6

2

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
21
Bidding Soon
395
All Active Projects
165
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

January 10, 2022

img_map_placeholder

Multiple Locations, Bakersfield, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.