BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2022 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a water / sewer project in Santa Ana, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

***As of March 3, the project has not yet been awarded. A timeline for award has not yet been established.*** Project no- 200-09382-18001-10, 17-SACP-Q0200, EA18CSA041, 2101 SA-2 Pressure Control Station Relocation and Transmission Main Improvements Q&A Deadline 12/21/2021 5:00 PM (PST The City of Santa Ana is located in the County of Orange in Southern California. The City encompasses 27.2 square miles and a population over 340,000 people. The City of Santa Ana Public Works Agency - Water Resources Division oversees and maintains the daily operations of the Water System and Sanitary Sewer System. The City of Santa Ana's water system has an average day demand of about 30 million gallons (MG) with 45,000 services. It is comprised of approximately 478 miles of water main, 45 MG of storage at five (5) sites, seven (7) Metropolitan Water District (MWD) connections, 21 groundwater wells, seven (7) pump stations, four (4) pressure regulating stations and utilizes two (2) pressure zones. The existing MWD SA-2 meter vault houses a 12-inch connection from the Metropolitan Water District's Orange County Feeder line (36-inch water main). The MWD SA-2 meter vault is currently located underneath the sidewalk on the south side of West 1 st Street, roughly 60 feet east of Bristol Street. Once outside of the meter vault, the existing 12-inch pipeline, which is cast iron and constructed in 1943, carries high-pressure water (approximately 170 psi) to an existing Pressure Reducing Station (PRS) located near the southeast corner of the intersection of Flower Street and 1 st Street. The water imported from MWD exits the PRS at a lower system pressure and is deposited into Walnut Reservoir and the distribution system. The existing connection normally operates around 8.0 cubic feet per second (cfs) and has a maximum capacity of 15.0 cfs.

Bid Results

Water / Sewer

$652,900.00

Public - City

Renovation, Site Work

114

12

6

5

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
576
Active Projects
246
Bidding Soon
3,901
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

February 14, 2022

Project location map

To Be Determined, Santa Ana, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.