BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2021 at 7:00 PM

Updated September 14, 2023

Site work and paving for a sidewalk / parking lot in Houston, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Work for all phases shall be performed within Two Hundred Seventy (270) calendar day Install pedestrian and bicycle safety improvements across the Memorial Heights Redevelopment Authority including, but not limited to: - Shared use trail construction - Restriping of Heights Boulevard to provide bicycle lanes - Restriping of West Dallas Street to provide bicycle lanes - Restriping of crosswalks - Installation of signage and wayfinding - Removal of bollards Installation of shared use trails, buffered bicycle lanes, pedestrian refuges, striping, and signing to improve pavement condition and provide safer conditions for pedestrians and cyclists for Memorial Heights Redevelopment Authority/TIRZ No. 5, Houston, Texas. Work includes demolition of existing sidewalks, bollards, and signs; installation of new bicycle and pedestrian facilities, signage, and site furnishings; and related work. - Heights Boulevard between Washington Avenue and Interstate 10 - Heights Boulevard at West 7th Street/MKT Crossing - Taylor Street at Spring Street - Houston Avenue at Spring Street/MKT Crossing - White Oak Drive at MKT Crossing - West Dallas Street between Dunlavy Street and Waugh Drive - White Oak Bayou and TC Jester Boulevard between Moy Street and Kansas Street Questions Related to Project a. Need to be submitted to Engineer no later than close of business Monday, November 29, 2021. CIP Project No.: T-0527, T-0528, T-0530 An SBE can be applied to the MBE and/or WBE Goal, but not to exceed 4%. Construction shall be substantially completed within 270 calendar days from the date of Notice to Proceed. All work items, including all punch list items shall be complete within 30 count calendar days after Notice of Substantial Completion.

Bid Results

Sidewalks / Parking Lot

$1,153,161.00

Public - City

Paving, Site Work

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
233
Bidding Soon
3,797
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2021

January 31, 2022

Project location map

Multiple Locations, Houston, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.