Renovation of a military facility in North Chicago, Illinois. Completed plans call for the renovation of a military facility.
Contract Award Date: Dec 20, 2022 Contract Award Number: N4008523C0002 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: RET9J885VQY4 Contractor Awarded Name: Aldridge Electric, Inc. Contractor Awarded Address: Libertyville, IL 60048 USA Base and All Options Value (Total Contract Value): $10061941.80 GENERAL OVERVIEW OF PROCURMENT PROCESS 1.1.1 This acquisition is being solicited on an unrestricted basis, with Full and Open Competition. 1.1.2 In accordance with FARS 36.204(g), The Magnitude of Construction for this Project is between $5,000,000 and $10,000,000. 1.1.3 The NAICS Code for this procurement is 236220 and the size standard is $39,500,000. 1.1.4 This solicitation is formatted as a Request for Proposal according to FAR Part 15. This method permits evaluation of proposals based on price competition, technical merit and other factors; permits impartial and comprehensive evaluation of offerors' proposals; permits discussions if necessary; and ensures selection of the source whose performance provides the best value to the Government. Description of work: This project creates an Installation ICS Operations Center as well as install a new Installation-wide (at NAVSTA Great Lakes) ICS network consisting of a high bandwidth backbone switching, network, and distribution fiber to connect building and Installation N4008522R2691 Page 5 of 81 SCADA assets to the communications backbone and build an integrated ICS network. The project will focus on 17 buildings Eleven (11) of the 17 buildings will undergo work as hub facilities in order to accommodate the fiber backbone and distribution networks as necessary. eROI score is 1.6 and SIR score is 1.4. The project can be broken down into the following five (5) key components. 1) Control Center - Renovating 400-500 SF (maximum 1384 SF) in Building 68 at NAVSTA Great Lakes to serve as an integrated industrial control system (ICS) control center for ICS operators, and ICS data center, and a data analysis center for NAVSTA Great Lakes. Stand-alone ICS (such as SCADA, DDC, and AMI) will be fully integrated and collocated allowing seamless monitoring and operations of the utility and facility energy systems using a common communications network. Access to the new ICS network will be provided in the Regional Operating Center (ROC) allowing access of key building and utility systems in the event of a base or regional emergency. 2) Backbone Fiber Network - Install approximately 38,000 LF of overhead (on existing utility poles) of new Installation-wide ICS network consisting of high bandwidth backbone switching and network fiber ring. 3) Distribution Fiber - Install approximately 43,000 LF of underground fiber lines (in existing ducts) to connect building and Installation SCADA assets and newly commissioned AMI metering to the communications fiber network as necessary. 4) Retro-commissioning (RCx) - Conduct retro commissioning in one facility (building 1506) totaling approximately 27,500 GSF). 5) Direct Digital Control (DDC) System Network Connectivity - Install network control panels and connect the existing DDC system in the buildings to the site-wide ICS network backbone. This will provide necessary network connectivity to the DDC system server in Building 68 for remote control and monitoring capabilities and more efficient utilization of existing DDC system. The existing DDC system in the buildings are primarily being used for HVAC systems (6 buildings (190, 236, 3540, 7101/02, 7111/12 and 7260). Direct Digital Control (DDC) System Replacement - Replace the existing DDC system with new in one (1) of the 17 buildings, Building 1506. The existing system in Building 1506 is obsolete, legacy Siemens product with some pneumatically operated end devices. The new DDC system will be the latest version of Siemens product and will be connected to and integrated into the DDC system server in Building 68. This will provide remote control and monitoring capabilities and allow the existing HVAC system operate more efficiently (Building 1506, approximately 27,500 GSF). Supervisory Control and Data Acquisition (SCADA) system Network Connectivity - Install network control panels and connect the existing SCADA system in the buildings to the site-wide ICS network backbone. This will provide necessary network connectivity to the SCADA system server in Building 11 for remote control and monitoring capabilities and more efficient utilization of existing SCADA system. The existing SCADA system in the buildings are primarily being used for water treatment and distribution, water storage tank and power distribution throughout the installation BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid. (b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.- (c) The amount of the bid guarantee shall be twenty (20) percent of the bid price or $3,000,000, whichever is less. PRE-PROPOSAL INQUIRIES (PPIs): All inquiries must be submitted in writing and received by the Contract Specialist no later than fourteen (14) days prior to the proposal due date in order to permit adequate time to reply to the inquiry. There is no guarantee that PPI's submitted after the cut-off date will be answered before the solicitation closes. Submit all questions to michelle.a.corsino.civ@us.navy.mil. Use of the PPI Log template is required. The PPI Log Template (Attachment A) can be found on the Contract Opportunities website under the Attachments section. SITE VISIT (CONSTRUCTION) (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. N4008522R2691 Page 18 of 81 (b) Please refer to Section 00 21 16 INSTRUCTIONS TO OFFERORS Pre-Proposal Conference and Site Visit. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Military
$10,061,941.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 31, 2022
November 1, 2022
530 Farragut Ave, North Chicago, IL
Related To This Project
North Chicago, IL
Bid Date: Sep 06 2022
North Chicago, IL
Bid Date: May 12 2023
North Chicago, IL
Bid Date: Nov 22 2022
North Chicago, IL
Bid Date: Dec 15 2022
North Chicago, IL
Bid Date: Sep 27 2022
North Chicago, IL
Bid Date: Dec 19 2022
North Chicago, IL
Bid Date: Apr 14 2022
North Chicago, IL
Bid Date: Apr 19 2022
North Chicago, IL
Bid Date: Oct 07 2022
North Chicago, IL
Bid Date: Oct 13 2022
North Chicago, IL
Bid Date: Oct 07 2022
North Chicago, IL
Bid Date: Nov 28 2022
North Chicago, IL
Bid Date: Mar 08 2023
Crystal Lake, IL
Bid Date: Oct 05 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.