Published March 6, 2025 at 7:00 PM

Updated March 7, 2025

Site work for a water / sewer project in Galveston, Texas. Working plans call for site work for a water / sewer project.

The proposed improvements include increasing the capacity of the existing storm sewer system and adding a stormwater pump station, which will have the ability to isolate the collection system from elevated water levels in the Galveston Ship Channel. This design report has been developed to document and summarize the design considerations. Numerous alternatives were considered in the initial analysis. Based on the completion of the 100% design phase, the recommended solution consists of the following: 15th Street gravity system drainage improvements including reinforced concrete box culverts from Avenue L to Slip 15. 16th Street drainage improvements from Seawall to Ave K. Lateral storm sewer connections to 15th Street from 14th Street and 16th on Ave K, Sealy Ave, Winnie Street, Market Street, and Strand Street, and north of Harborside Drive. Increased inlet capacity at all intersections along 15th Street Stormwater pump station on the north side of Harborside between 15th and 16th Streets on Port of Galveston property with eight (8) submersible electric pumps with an estimated total capacity of 555 CFS, one smaller pump to handle lower flows, and a sump pump for maintenance of the wet well. Two (2) 1000 KW emergency backup generators, associated electrical equipment, diesel fuel storage tank, and fuel supply system. A controls and operations room designed to meet FEMA Safe Room requirements. Elevated transformer pad and diesel fuel tank. Vertical lift gates for diverting flow to the pump station and stoplogs to isolate wet well, outfall basin, and outfall structures for maintenance. Flap gates at the 14th Street and 15th Street outfalls Mechanical trash rakes for automated removal of trash/debris prior to entering the wet well for the pumps. As of March 6, 2025, the project is in 100% Design Complete. A tentative bid schedule for contractors is scheduled for 2026. Further details regarding construction and completion timelines have not been identified. Funding has not been allocated.

Final Planning

Water / Sewer

$35,709,185.00

Public - City

Site Work

320

26

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
4
Bidding Soon
1,853
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

14th St, Galveston, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.