BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Yuma, Arizona. Completed plans call for site work for a playground / park / athletic field.

As of September 13, 2022, this project has been awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to October of 2022. The amount programmed for the base bid is $15,500,000.00 47908 This project is located in the City of Yuma, Arizona. The project includes construction of a Detention basin west of the existing Ray Smucker Park. The basin will be fonned by constructing an earthen embankment, which will generally run parallel to, and on the East side of the East Main Canal, and will tie into the existing slope on the north and south side of the project. The new Detention basin includes and elevated pathway bifurcating the basin from east to west. An underground pipe will hydraulically connect north end of the basin to the outlet pipe, which will be constructed near the south end of the basin. Two large, highly specialized concrete box culverts entering the basin from the east will bring storm water to the basin. The Project is located in Yuma County, Arizona. The project is located in the City of Yuma, between Avenue A & East Main Canal, north of 32nd Street, Section 5, Township 9S, Range 23W. A brief description of the work to be performed includes: Construction of a Detention basin west of the existing Ray Smucker Park, embankment construction with embankment central filler, soil nail wall shoring, sheet pile Coffer dam, flood gate, Flood wall, Reno mattress, rip rap, catch basins, basin emergency overflow spillway Storm Drain system, two large, highly specialized concrete box culverts, outlet structures, pathway will be constructed on top of the embankment with ramps leading down into the basin area, a new asphalt access road, a new pump station will be installed, removal of existing pump and discharge line, chain link fence. Removal of several existing storm drain pipes and headwalls. Removal of a section of existing 36-inch sanitary sewer approximately 1,650 feet long, new sewer will be replaced by 1,900 feet of 36-inch centrifugally cast, fiberglass-reinforced, polymer mortar pipe (CCFRPMP) sewer, A section of 18-inch sanitary sewer pipe approximately 560 feet long will also be relocated as part of this project. The proposed work is located in the City ofYuma,BetweenAvenueA&East Main Canal, North of 32ndStreet. The work consists of, but is not limited to construction of a new detention basin, storm drainimprovements, culverts,headwalls,removalandinstallationof sanitary sewermiscellaneous improvements.

Award

Water / Sewer

$15,500,000.00

Public - County

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
10
Bidding Soon
120
All Active Projects
51
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 20, 2022

March 21, 2022

img_map_placeholder

2913 S Avenue A, Yuma, AZ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.