BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2022 at 7:00 PM

Updated November 14, 2023

Site work and paving for a sidewalk / parking lot in Wildwood, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Scope of Work includes removal and replacement of existing curb ramps with ADA-compliant ramps as identified in the construction documents. Direct all questions to Brendan Maher at brendan@cityofwildwood.com The Contractor shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Sum as security for the faithful performance of this Contract and also a Labor and Material Payment Bond in an amount not less than one hundred percent (100%) of the Contract Sum. Contractors, subcontractors, developers and subrecipients of OCD funding should make every effort possible to utilize certified Women Owned Business Enterprises, referred to as WBEs, and Minority Owned Business Enterprises, referred to as MBEs. St. Louis County has the following aggregate goals for each classification (based on contract dollars): Construction - 24% MBE, 9.5% WBE Non-Construction -16% MBE, 15% WBE

Award

Sidewalks / Parking Lot

$35,422.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
95
Bidding Soon
1,213
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2021

January 14, 2022

Project location map

Multiple Locations, Wildwood, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.