BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Lawndale, California. Completed plans call for the renovation of a educational facility.

**As of February 17, 2022 this project has not yet been awarded. A timeline for award will be on March 10, 2022. Bid Package 2022 Measure L Replacement of Ductless A/C Units in MDF Rooms Bids shall be valid for 60 calendar days after the bid opening date. The scope of work involves the procurement and installation of new Mitsubishi Slim Line 1.5 ton mini-split HVAC units at 5 different school locations; procure and install Mitsubishi wireless thermostat and wireless adapter kit; demolition and disposal of existing HVAC systems in their entirety, install new 20 gauge galvanized sheet metal panel at existing HVAC openings, repair and patch existing wall openings where existing HVAC units have been removed; repair and patch any other wall/ceiling penetrations resulting from exterior system removal. Scope of work shall include, but not be limited to, procurement and installation of Mitsubishi Slim Line HVAC units, high voltage and low voltage wiring, Mitsubishi wireless thermostat and wireless adapter kit, all necessary conduit and refrigerant lines with metal flashing at roof top penetrations, new electrical panel circuit breakers where required, high voltage heavy duty electrical disconnect switches, modifications or replacement of electrical circuit breakers and wiring, copper condensate lines and drywells, repair of all wall openings where existing HVAC units have been removed and disposed of, as well as any other penetrations that require repairs. Existing roofs are under manufacturer's warranty; contact roof manufacturers for specifications for roof penetration requirements. Rogers Middle School: Johns Manville; all other schools: The Garland Company, Inc. The above is not intended as an all-inclusive requirement list; additional tasks and material may be required for the completion of the project, and are the responsibility of the contractor. Contractor shall within 5 days of the Notice to Proceed procure all necessary materials to complete and deliver the project. Contractor shall procure and install all necessary equipment to deliver fully functioning HVAC units to the District per the scope of work and the contract documents. All equipment and material shall meet all applicable codes, regulations, laws, and construction trades industry practices and standards, as well as product, material, and equipment manufacturer's recommendations.

Award

Educational

$69,647.00

Public - City

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
105
Bidding Soon
2,249
All Active Projects
995
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

March 11, 2022

img_map_placeholder

Multiple Locations, Lawndale, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.