BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Montrose, Colorado. Completed plans call for site work for a water / sewer project.

21144 The City of Montrose is requesting formal bids through the Invitation for Bid process to complete the Southeast Water Transmission Main Construction Project. This project will include the construction of approximately 1.8 miles of 24" HDPE waterline between Sunnyside and East Oak Grove Roads. The City reserves the right to accept or reject any or all bids, to waive irregularities and/or informalities and to disregard all non-conforming, non-responsive, unbalanced or conditional bids. The City of Montrose complies with all Equal Opportunity requirements. All qualified bidders will receive consideration without regard to race, creed, color, national origin, sex, marital status, religion, ancestry, mental or physical handicap or age. The project is also bid according to the City of Montrose local preference policy in effect on the date of the bid opening and detailed in the official Municipal Code of the City of Montrose, Section 1-16-4(B). Addenda will be posted to the website and it is the bidder's responsibility to download, review, sign, and include addenda with their bid. The project consists of furnishing all labor, equipment, and materials necessary to complete construction of the Southeast Water Transmission Main Construction Project in accordance with the project plans and specifications. This includes, but is not limited to, the following key tasks: A. Pothole existing utility crossings and work with with City to finalize the pipeline's vertical and horizontal alignment (see Section 1.5). B. Perform removals for the project to include asphalt pavement and concrete work as required to accommodate new construction. C. Construct a new 24" HDPE water transmission main to include mainline, tie-ins, thrust collars, air release assemblies, combination air valves, butterfly valves, remote-controlled butterfly valves, flow meters, and a fire hydrant. D. Relocate conflicting water, sewer, and dry utilities along the pipeline alignment as necessary. E. Perform asphalt patching and site restoration of right of way/park improvements. F. Implement stormwater management (incl. stormwater management plan), traffic control (incl. preparation of traffic control plans), site security, site restoration, final grading, and quality control testing as necessary to complete the work.

Bid Results

Water / Sewer

$3,228,068.00

Public - City

Site Work

24

5

4

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
5
Bidding Soon
114
All Active Projects
39
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

February 14, 2022

img_map_placeholder

Multiple Locations, Montrose, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.