EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 2, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a medical facility in South Mountain, Pennsylvania. Completed plans call for the renovation of a medical facility.

The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. .1 General $900,000 - $1,000,000 CONTRACT NO. DGS C-0557-0022 PHASE 1.1 - GENERAL CONSTRUCTION *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. HVAC Upgrades, Main Building Samuel G. Dixon (Building No.1) and The Secure Treatment Unit (STU) at South Mountain Restoration Center (Building No.7) A. The Work of this Project consists of, but is not necessarily limited to, the following. Detailed requirements of the Work are described in the pertinent specification Sections and/or shown on the Drawings. B. General Construction (.1) Contract: Building 1: 1. Providing suitable floor protection at the start of construction activities in each area of work and removing the floor protection prior to final cleaning of each area. 2. Removal, replacement and/or reconfiguration of ACT- acoustical tile ceilings as required to accommodate the removal of the existing HVAC components (in select area) as well as the installation of new HVAC components through-out floors 3, 5, and 6, as selected by contract. Existing curtain tracks shall be secured and protected in place for the duration of construction. [Note all associated privacy curtains and equipment/lift frames will be removed, stored and replaced by the Client Agency as required to accommodate the construction] 3. Construction of new (small) equipment rooms within the existing Lounges in the center of the building to accommodate the ERV equipment serving these areas of floors 3, 5, and 6, as selected by contract. 4. Removal of existing lockers and demolition of their bases and adjacent walls in the wing areas (existing locker rooms and/or mechanical rooms) to accommodate the ERV equipment serving these areas of floors 3, 5, and 6, as selected by contract. 5. Installation of new metal frames, wood doors and associated door hardware as required for all equipment rooms to accommodate the installation and servicing of all ERV equipment 6. Patching and painting of all new walls and all existing wall finishes disturbed by the construction. 7. Cutting of existing terrazzo (floor) base as required to accommodate the installation of new walls as required by the construction of new walls, installation of new doors. 8. New vinyl cove base at the base of the new walls, as well as new chair rail to match the existing of the new (small) equipment rooms within the existing Lounges in the center of the building to accommodate the ERV equipment serving these areas of floors 3, 5, and 6, as selected by contract. 9. Final cleaning of floors and finish surfaces in each area of work. Each area shall be restored to the same condition as when it was turned over by the Client Agency at the start of work. 10. New protective walk-mats compatible with the existing membrane roof in areas adjacent to the new roof mounted HVAC chillers/compressor. C. HVAC Construction (.2) Contract: (LEAD CONTRACTOR) Building 1: 1. Provide associated supply, return, exhaust, and intake ductwork, louvers, diffusers/grilles and controls associated with the ERV units. The ERV supply ductwork shall be connected to the indoor variable refrigerant flow(VRF) air handling units. 2. Provide multiple indoor VRF ducted units, cassettes, and highwall units. 3. Provide associated ductwork, diffusers, grilles, condensate pumps and controls with each VRF unit. The VRF unit sizes will vary from 1/2 ton to 4 tons. 4. Provide condensate piping from VRF unit discharge to approved termination. 5. Provide associated refrigerant piping connecting indoor VRF units with branch controllers and associated roof mounted condensing units. 6. Provide roof mounted condensing units at locations indicated. 7. Provide site fence around the designated office trailer, storage trailer and laydown area. 8. Provide snow removal and anti-skid material as required in Section 015000. 9. Provide equipment and broadband service for the DGS Project Coordinator office. Building 7: 1. Remove and replace Ten (10) existing dx, gas fired rooftop units in kind. 2. Extend existing rooftop unit curbs to 33" above finished roof. 3. Remove and replace Thirteen (13) existing exhaust fans. 4. Existing ductwork, curbs, and appurtenances shall remain to the extent possible. Modify existing as necessary for new unit installation. 5. Modify existing refrigerant piping and condensate piping as necessary for new unit installation. 6. Provide new controls for installed equipment and tie into existing system as applicable. 7. Provide site fence around the designated office trailer, storage trailer and laydown area. 8. Provide snow removal and anti-skid material as required in Section 015000 Bid Results :: Bid Package Name: DGS C-0557-0022 Phase 1.1 General Construction Base Bid 1 :: EAST COAST CONTRACTING INC 1,218,000.00 Base Bid 2 :: EAST COAST CONTRACTING INC 1,273,000.00 Base Bid 3 :: EAST COAST CONTRACTING INC 1,328,000.00 Bid Package Name: DGS C-0557-0022 Phase 1.2 HVAC Construction Base Bid 1 :: Rodney B Smith P & H 4,497,000.00 Base Bid 2 :: Rodney B Smith P & H 4,635,700.00 Base Bid 3 :: Rodney B Smith P & H 4,781,400.00 Bid Package Name: DGS C-0557-0022 Phase 1.3 Plumbing Construction Base Bid 1 :: Rodney B Smith P & H 452,525.00 Base Bid 2 :: Rodney B Smith P & H 452,525.00 Base Bid 3 :: Rodney B Smith P & H 452,525.00 Bid Package Name: DGS C-0557-0022 Phase 1.4 Electrical Construction Base Bid 1 :: Cyprium Solutions, Inc. 1,239,000.00 Base Bid 2 :: Cyprium Solutions, Inc. 1,330,000.00 Base Bid 3 :: Cyprium Solutions, Inc. 1,422,000.00 Completion- 513 calendar days Bid Results:- GRC General Contractor, Inc. Base Bid 1 - 635,487 Base Bid 2 - 742,334 Base Bid 3 - 870,362 Base Bid 4 - 995,718

Bid Results

Medical

$3,243,901.00

Public - State/Provincial

Renovation

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Fabricator Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Wall and Door Protection, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Enclosed Controllers, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Dewatering, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
96
Bidding Soon
1,907
All Active Projects
776
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2022

September 12, 2022

img_map_placeholder

10058 S Mountain Rd, South Mountain, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

HVAC Upgrades - South Mountain Restoration Center and Secure Treatment Center - General Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.