BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Wilson, North Carolina. Completed plans call for the renovation of a educational facility.

Installation of Green Alley The purpose of the proposed project is to treat stormwater runoff from adjacent rooftops, as part of a watershed improvement project and for use in research trials for the North Carolina Department of Environmental Quality (NC DEQ) The alley is to be retrofitted to include approximately 1520 sq. ft. of permeable interlocking pavers (PIP), an above-ground rainwater cistern with a volume of 2,000 gal., and approximately 620 sq. ft. of new non-permeable concrete surface. Demolition and removal of the current pavement shall be completed by the City of Wilson at the start of construction. The contractor will be responsible for all excavation and earth removal associated with the project. Silt fences and filter socks to control sediment erosion will be installed by the City of Wilson, but the contractor will be responsible for repairing or replacing these measures if necessary. The PIP shall be installed at grade spanning the width and length of the alley between 107 Douglas St S and 300 Nash St S in Wilson, NC 27893 as shown in Figures 1 and 2 (next page) and on the attached plan sheet. Concrete used as surface pavement in non-permeable areas shall be of a similar color to that of the chosen pavers. A nearby lay area will be provided by the City of Wilson for staging and storage of equipment and materials. Traffic control can be coordinated with the City of Wilson as needed. The PIP shall sit atop various layers of permeable bedding and base materials as specified in the attached plan sheet. The stone base layer shall be drained by a perforated PVC underdrain with cleanout valves, observation wells, and routed to Triton M-6 Chambers and to an existing stormwater catch basin (see attached plan sheet). The permeable pavement, underdrain, and observation wells shall be included in ongoing stormwater research at NC State University. The above-ground rainwater cistern shall be provided and installed by NC State atop the raised parking lot in the corner between the alley and the mural as indicated in Figure 1. The cistern shall be plumbed by the contractor to receive stormwater runoff from the adjacent. Cistern water shall be made available to irrigate the vegetated components of the green alley, and any overflow produced during large storm events shall be routed to the Triton M-6 Chambers below the PIP.

Post-Bid

Educational

$200,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
54
Bidding Soon
1,070
All Active Projects
435
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2022

January 17, 2022

img_map_placeholder

Multiple Locations, Wilson, NC


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.