Published January 7, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Mayville, New York. Completed plans call for the renovation of a educational facility.

NEW PK-12: 06-05-03-04-0-012-014 STORAGE BUILDING #3: 06-05-03-04-2-018-003 The deadline for RFIs is December 7th, 2021, at 5:00pm. Chautauqua Lake Central School District 2020 Capital Improvements Project - Phase 2 Bid Bond or Certified Check in the amount of five percent (5%) of Base Bid is required and must accompany proposal. Performance Bond and Labor Material Payment Bond equal to one hundred percent (100%) of Contract Sum are required to be delivered at time Contract is signed with Owner. No bidder may withdraw their bid within forty-five (45) days after date of bid opening. Bidders will comply with New York State prevailing wage and supplement requirements. The Chautauqua Lake CSD hereby reserves the right to waive any informalities and reject any or all Bids or to accept the one that in its judgment will be in the best interest of Chautauqua Lake CSD. Bid Results :- CIVIL/SITE CONSTRUCTION Lake Shore Paving $4,605,600 GENERAL CONSTRUCTION Perry Construction Group $6,856,000 KITCHEN EQUIPMENT Kittredge Equipment Company $1,250,771 PLUMBING M.K.S Plumbing $348,000 MECHANICAL Mazza Mechanical $1,079,000 ELECTRICAL Ahlstrom Schaeffer $1,156,684

Bid Results

Educational

$15,296,055.00

Public - County

Renovation

206

28

132

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Cast-in-Place Concrete, Post-Tensioned Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Membrane Roofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Specialty Doors and Frames, Coiling Doors and Grilles, Coiling Counter Doors, Panel Doors, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Tiling, Ceramic Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Wood Flooring, Resilient Flooring, Resilient Sheet Flooring, Resilient Tile Flooring, Fluid-Applied Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Foodservice Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Manufactured Wood Casework, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Rugs and Mats, Runners
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Purpose Rooms, Athletic and Recreational Special Construction, Safety Netting
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Vibration and Seismic Controls for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Special Exhaust Systems, Sawdust Collection Systems, Air Terminal Units, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Electrical and Cathodic Protection, Facility Lightning Protection, Lightning Protection for Structures, Lighting, Interior Lighting, Special Purpose Lighting, Security Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Athletic and Recreational Surfacing, Synthetic Resilient Surfacing, Site Improvements, Fences and Gates, Screening Devices, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Manufacturing Lines and Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
91
Bidding Soon
1,167
All Active Projects
522
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

February 14, 2022

img_map_placeholder

100 N Erie St, Mayville, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Chautauqua Lake CSD 2020 CIP - Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.