BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Greenwood, South Carolina. Completed plans call for the demolition of a residential development; and for site work for a residential development.

As of December 27, 2021, project was awarded to Seven Hills Construction for $27,972.20. The purpose of this solicitation is to contract a company to demolish, remove all debris, and safely transport and properly dispose materials in a regulated landfill at the following sites : 4805 Main Street Hodges (Greenwood County Tax ID 6829-099-470) and 804 Gage Street Greenwood, SC (Greenwood County Tax ID 6855-202-800) 1) Use Safe Work Practices to tear down, demolish, raze, remove and cart away all material to appropriate dumping facility comprising of said building(s) components, to ground level. The site is not to be prepared suitable for construction. 2) Remove all debris of whatever materials arising from the demolition of the building(s) including all contents, demolition debris, debris in the yard, and cart away to leave the portion of the designated premises cleaned to the ground level.1) Use Safe Work Practices to tear down, demolish, raze, remove and cart away all material to appropriate dumping facility comprising of said building(s) components, to ground level. The site is not to be prepared suitable for construction. 2) Remove all debris of whatever materials arising from the demolition of the building(s) including all contents, demolition debris, debris in the yard, and cart away to leave the portion of the designated premises cleaned to the ground level. 3) The Hodges site has a house, a detached garage/building and debris from a house that was removed on the backside of property, this is all included in the demolition and debris removal. 4) The Gage Street property has one home that needs to be demolished and debris removed. 5) All sewers and septic tanks must be capped. The Contractor is responsible for calling a utility locator before starting work. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Residential Subdivision

$27,972.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
46
Bidding Soon
821
All Active Projects
399
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2021

January 7, 2022

img_map_placeholder

Multiple Locations, Greenwood, SC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.