BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Columbus, Ohio. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

As of January 10, 2022, this project has not yet been awarded to a general contractor. An award is anticipated to be made around late January 2022. Plans consist to renovate select areas of the existing 1st and 2nd floors of Evans Hall to create more functional program spaces and support the College's growing needs. The project consists of renovating suite 144 to create a lab with tissue culture space, renovating room 248 to create office space, and creating ADA restrooms on the 1st and 2nd floors. This includes the removal and reconfiguration of walls, removal of existing cabinets and sinks, and abatement of any hazardous materials. EDGE Participation Goal: 5% of contract DOMESTIC STEEL USE IS REQUIRED PER ORC 153.011. Contract Estimated Cost General Contract $ 602,425.00. The Board of Trustees of The Ohio State University reserves the right to waive any informalities or to reject any or all bids. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff. 1. Evans Hall is located at 520 King Ave, Columbus, Ohio. The College of Medicine intends to renovate select areas of the existing 1st and 2nd floors of Evans Hall to create more functional program spaces and support the College's growing needs. The project scope consists of renovating suite 144 to create a lab with tissue culture space, renovating room 248 to create office space, and creating ADA restrooms on the 1st and 2nd floors. This includes the removal and reconfiguration of walls, removal of existing cabinets and sinks, and abatement of any hazardous materials. a. The area of alterations is approximately 2,850 sf on the 1st and 2nd Floors. b. Refer to the drawings for the scope of alterations and finish replacements. 2. The scope of work also includes the installation of new supply and exhaust air ductwork, terminal boxes, air valves, domestic water piping, waste and vent lines, power, emergency power, lighting, data, security, walls, doors and ceilings in the area of work, all to the extent as described in these Contract Documents. 3. All work will be designed to meet existing Ohio State University and Wexner Medical Center Building Design Standards (BDS), including standards established within the James.

Bid Results

Educational

$490,000.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
91
Bidding Soon
2,462
All Active Projects
982
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 9, 2021

January 10, 2022

May 2, 2022

img_map_placeholder

520 King Ave, Columbus, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.