BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Earp, California. Completed plans call for site work for a water / sewer project.

Rock House Visitor Center Water Line Construction Period of Performance: 02/01/2022 to 08/01/2022 The contractor shall provide all labor and material required to complete the requirements of the Construction Documents. Anticipated Period of Performance: February 1, 2022 - August 1, 2022. Product/Service Code: C1NE Product/Service Description: Architect and Engineering- Construction: Water Supply Facilities North American Industry Classification System (NAICS) 237110 Size Standard $39.5 in millions of dollars. Small Business Set-Aside Yes, Total Small Business Set-Aside Period of Performance 5 months from the date of contract award Method of Evaluation Lowest Price Technically Acceptable (LPTA) Question Due Date Monday, November 29, 2021, at 1200 MNT The Bureau of Land Management (BLM) Arizona State Office is seeking quotations for construction services as attached in the accompanying Construction Documents. The BLM intends to conduct this acquisition by use of simplified acquisition procedures in accordance with (IAW) Federal Acquisition Regulation (FAR) Part 13. A single contract award will be made to the offeror that submits a quotation that has been determined to be the Lowest Price Technically Acceptable offeror. NEW WATERLINE CONSTRUCTION TO REPLACE THE EXISTING RECREATION SITE WATER SYSTEM FROM RIO DEL COLORADO RESORT TO ROCK HOUSE WITH A NEW HDPE BUTT FUSION WELDED LINE

Post-Bid

Water / Sewer

$50,000.00

Public - Federal

Site Work

12

3

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
30
All Active Projects
8
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.