BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2022 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Morgantown, West Virginia. Completed plans call for the renovation of a educational facility.

Owner Furnished, Contractor Installed stage lighting and accessories, as well as significant upgrades to the dim-able lighting infrastructure. Provide modular mechanical type seals, consisting of interlocking synthetic rubber links shaped to continuously fill annular space between pipe and sleeve, connected with bolts and pressure plates that cause rubber sealing elements to expand when tightened, providing watertight seal and electrical in Provide medium voltage load interrupter switches where indicated on drawings. Provide all necessary terminations for cabling. Provide 4" housekeeping pad for switch. Extent of switchboard work The system shall be designed for the control of architectural and theatrical lighting and shall consist of factory pre-wired dimming and processing rack enclosures containing dimmers, relays, power supplies, breakers, terminals and/or control electronics. There will be a Mandatory PreBid - all attendees must follow COVID19 precautions, including wearing a mask and social distancing. West Virginia University on behalf of its Board of Governors ("BOG") located in Morgantown, West Virginia ("WVU" or "University") is initiating this Request for Bids ("RFB") from qualified, experienced, and licensed Contractors for Owner Furnished, Contractor Installed stage lights as well as significant upgrades to the dimmable lighting infrastructure. Work to be performed over the Summer of 2022 while the theater is closed. Cutoff for Questions: Date: April 1, 2022 Time: 12:00 pm EST LIQUIDATED DAMAGES - The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated above. The date of issuance of the West Virginia University's Notice to Proceed or Executed Agreement shall be used to calculate Substantial and Final Completion of contract time stated in number of consecutive calendar days or established date. Time is of the essence. Liquidated Damages shall be Five Hundred Dollars ($500) per Calendar Day of delay beyond December 2, 2022.

Award

Theaters / Auditoriums

$1,148,236.00

Public - State/Provincial

Renovation

19

13

2

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
84
Bidding Soon
1,252
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

June 2, 2022

Project location map

1436 Evansdale Dr, Morgantown, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.