BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Aptos, California. Completed plans call for site work for a water / sewer project.

**As of 12/29/2021 Project has no awards yet , no time frame . This project involves the construction of a soldier pile retaining wall, midwest guardrail systems, reconstructed roadway, drainage improvements, erosion control and revegetation. The Department of Public Works hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Bidders are advised that, as required by federal law, the County of Santa Cruz is implementing new Disadvantaged Business Enterprise requirements for Disadvantaged Business Enterprises (DBE). The DBE Contract Goal is 3 percent. In addition, bidders shall provide documentation showing that adequate good faith efforts were made to meet the goal as required in the Special Provisions. The County of Santa Cruz Department of Public Works (County), in conjunction with the California Department of Transportation (Caltrans) and the Federal Highway Administration (FHWA), intends to repair storm damage to Valencia Road at Post Mile 0.34. In January 2017, a slide on the north side of the road covered a drainage inlet which caused the storm water to cross the roadway and wash out a 60-ft by 12-ft wide section of roadway and embankment. Emergency Opening (EO) repairs consisted of tarping the washout, and placing barricades and warning signs at the damaged site. The site is eligible for FHWA Emergency Repair funds. Proposed permanent repairs include installation of a retaining wall or flexible wall downslope of the road, drainage improvements, roadway reconstruction, erosion control, and revegetation. Three trees along the roadside may need to be removed to accommodate the repair work. All repair work will be performed from the existing roadway within the County right-of-way. Construction for the Project is planned for construction in spring/summer 2019 and is estimated to take one season to complete.

Award

Water / Sewer

$654,000.00

Public - County

Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
117
Bidding Soon
2,348
All Active Projects
986
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 16, 2021

March 7, 2022

July 19, 2022

img_map_placeholder

Valencia School Rd, Aptos, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.