Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 8, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of an educational facility in Kenosha, Wisconsin. Completed plans call for the renovation of a educational facility.

In general the work consists of: Replacing the existing indoor natural gas generator serving Molinaro Hall with a new 25kW, exterior, natural gas packaged generator. A 100A portable generator connection box will also be installed. Modifications to the site and existing generator room will be made to connect the new generator to the existing emergency distribution system in Molinaro Hall. Additionally, there are six additional generators on campus that will be connected to the BAS system. Work fully complete all work within 90 consecutive calendar days

Under Construction

Educational

$163,777.00

Public - State/Provincial

Renovation

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
550
Active Projects
220
Bidding Soon
4,059
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

January 25, 2022

Project location map

900 Wood Rd, Kenosha, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed