EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2024 at 8:00 PM

Updated March 12, 2024

Renovation of a mixed-use development in Danbury, Connecticut. Completed plans call for the renovation of a educational facility; and laboratory facility.

Work consists of all labour, tools, materials, and equipment necessary for the removal and replacement of the existing science labs including related fire protection, plumbing, mechanical, and electrical systems. Work also includes all necessary hazardous materials abatement. Questions regarding this request for qualifications and proposals can be directed to Charles Volpe, Purchasing Agent, via email at c.volpe@danbury-ct.gov. The deadline for requests for information will be at 10:00 A.M. on February 9, 2023. A bid bond in an amount not less than five percent (5%) of the amount of the bid shall accompany each bid. A non-collusion statement for Prime Contractors and any addendum acknowledgment must also be submitted at the time of the bid. A performance, labor, and materials bond in an amount equal to one hundred percent (100%) of the accepted bid will be required. This contract is subject to state contract compliance requirements, including set-aside (twenty-five percent (25%) SBE and six and one-quarter percent (6.25%) M/W/DisBE) and non-discrimination requirements enforced by the CHRO. The City of Danbury reserves the right to accept or reject any or all bids and to award the contract to the bidder deemed to be for its best interest. The Work generally includes, but is not necessarily limited to the following major elements: 1. Removal of selected building materials and components, including selected existing fire protection, plumbing, mechanical, and electrical systems. 2. Removal and offsite disposal of limited asbestos and hazardous materials. 3. Offsite disposal of all removed materials. 4. Demolition of selected existing masonry walls with construction of new, including infill. 5. Removal and replacement of existing casework and cabinetry, including fume hoods, as well as the provision and installation of new where indicated. 6. Removal and replacement of flooring, base, ceilings, and visual display boards. 7. Removal and replacement of doors, frames, and hardware. 8. Provision and installation of signage and appliances, and painting throughout. 9. Provision of cutting/boring and patching/firesafing for any new penetrations of any diameter. 10. Provision and installation of new concealed sprinklers in new ceilings, connecting to existing sprinkler system. 11. Plumbing: a. Removal and replacement of sinks with new epoxy resin, integral with countertops. b. Removal and replacement of existing point of use acid neutralization tanks under sinks within cabinetry. c. Removal and replacement of existing freestanding emergency eye wash/showers, using tepid water. d. Removal and replacement of gas jets with new that have emergency shutoff valves and mushroom shutoff switches. e. Removal and replacement of waste and vent systems and domestic water piping. f. Provision and installation of new DI water faucets, one (1) per floor. 12. Mechanical: a. Removal of existing lab hood exhaust systems (fans, associated ductwork, controls, etc.). b. Removal and replacement of the existing perimeter fintube radiation, associated steam trap, pneumatic control valve, and actuator with minor replacement of some existing steam and condensate piping. c. Removal and replacement of existing ceiling diffusers/grilles where indicated. d. Cleaning of existing ductwork. e. Testing and balancing of existing fans, duct coils, etc. to remain. 13. Electrical: a. Removal and reinstallation or replacement of light fixtures, switches, and occupancy sensors, where indicated. b. Removal and reinstallation or replacement of receptacles, power devices, fire alarm devices, speakers, clocks, and other network devices where indicated. c. Provision and installation of new circuit breaker in existing switchboard to feed the new transformer. d. Provision and installation of new panelboards. e. Disconnection and removal of existing electrical connections to indicated exhaust fans, located on roof, where indicated. C. Work is to be phased per the Drawings. Fourth floor work is to be completed in Summer 2024 and fifth floor work is to be completed in Summer 2025. Refer to Construction/Phasing Schedule & Execution below

Award

Laboratories

$9,826,648.00

Public - City

Renovation

73

33

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Starting and Adjusting, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Wood Shingles, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Access Doors and Frames, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Window Treatments, Casework, Furnishings and Accessories, Furnishing Accessories, Clocks, Waste Receptacles, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Ventilation Hoods, Fume Hoods, HVAC Air Cleaning Devices, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
228
Bidding Soon
4,777
All Active Projects
1,880
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 21, 2024

img_map_placeholder

43 Clapboard Ridge Rd, Danbury, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.