Site work and renovation of a mixed-use development in Houston, Texas. Working plans call for the renovation of a power facility; for site work for a power facility; service station / car wash facility; and service station / car wash facility.

**As of 2/22022 This project was canceled and not awarded. The following summary of work is provided as a guide to assist contractors in understanding the general scope of electrical work that is part of this contract. Detailed descriptions and requirements are included in the drawings and specifications: Demolish trees adjacent to Central Plant at Cravens Road and provide new concrete pad for new emergency power generator. Install new OFCI (Owner Furnished Contractor Installed) emergency power generator. Install new OFCI Automatic Transfer Switch (ATS) in Police Storage at building N10. Disconnect power to switchboard 'WL', panelboard 'LV-1' at Central Plant, panelboard 'EH1' at building N12 and shutdown natural gas service at central plant. Demolish existing manual transfer switch and tap box serving building N10. Demolish existing transformer 'TXX' in IT room N10.149A, associated disconnect switch, exterior wall mounted pullboxes, associated conduit and wiring. Make natural gas piping connection to new emergency power generator. Make power and control connections for generator and ATS. Transfer loads from A/C units serving IT room N10.149A over to the existing emergency panel 'EGL' at N10 backed up by new generator. Provide new circuit breakers. Transfer loads from IT equipment in IT room N10.149A over to the emergency panel 'EGL'. Provide new circuit breaker. Request and provide inspection and start-up procedure for new emergency power generator by manufacturer's representative. Project Estimate: Current estimate for work is approximately one hundred sixty thousand dollars ($160,000). Schedule: Work is scheduled to start upon delivery of the generator, estimated delivery of August 2022. This project shall be completed within ninety (90) days from date of delivery of the generator. Owners Project ID # 732606 for Emergency Power Generator for N10 Engineer's Project ID # 21a08, 19a09, 21105 Project Address: North Campus, 5800 Uvalde Road, Houston TX 77049

Final Planning

Power Plant

$160,000.00

Public - County

Renovation, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
59
Bidding Soon
2,741
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2021

August 2, 2022

img_map_placeholder

5800 Uvalde Rd, Houston, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.