BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a civil project in Sunrise, Florida. Completed plans call for the renovation of a water / sewer project.

Deadline for Questions Day/Date: Tuesday, November 7, 2023 Time: 12:00 Noon The Contractor shall furnish a Public Construction Bond to the City in an amount not less than one hundred percent (100%) of the Contract Price Work includes, but not limited to, the construction of the following: (1) Approximately 1,300 linear feet (LF) of 24-inch HDPE and 24-inch and 16-inch stainless steel pipe for the Sawgrass Water Treatment Plant's (WTP) concentrate disposal line, including valves, magnetic flow meters, and air release valves, to replace the existing 24-inch ductile iron pipeline. The new pipe will be routed from the existing concentrate well, CW-1, to a piping trench inside the Chemical/Mechanical Building, where it will be connected to an existing 20-inch stainless steel pipe. The piping will be above grade at CW-1 and will be buried from the CW-1 containment pad to the piping trench inside the Chemical/Mechanical Building. (2) A new Hydropneumatic Level Control system, designed by the manufacturer, connected to the buried membrane concentrate pipe. (3) Approximately 1,00 linear feet of 3-inch PVC sump pump drain piping from CW-1 to connect to existing 3-inch PVC drain piping located in the yard outside the Chemical/Mechanical Building. (4) Removal of existing membrane elements, installation of new membrane elements and accessories, start-up, and performance testing for one nano- filtration membrane system (NFMS) treatment train (Train No. 1). Project is included in the City of Sunrise's FY 2022-2026 CIP. As of November 17, 2023, information regarding a design team or a general contractor is not available. Construction is anticipated in FY 2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Award

Water / Sewer

$1,800,000.00

Public - City

Renovation

24

21

9

8

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
46
Bidding Soon
1,105
All Active Projects
490
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2023

February 8, 2024

img_map_placeholder

14150 NW 8th St, Sunrise, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.