Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 31, 2024 at 7:00 PM
Updated February 27, 2024
Renovation of a civil project in Sunrise, Florida. Completed plans call for the renovation of a water / sewer project.
Deadline for Questions Day/Date: Tuesday, November 7, 2023 Time: 12:00 Noon The Contractor shall furnish a Public Construction Bond to the City in an amount not less than one hundred percent (100%) of the Contract Price Work includes, but not limited to, the construction of the following: (1) Approximately 1,300 linear feet (LF) of 24-inch HDPE and 24-inch and 16-inch stainless steel pipe for the Sawgrass Water Treatment Plant's (WTP) concentrate disposal line, including valves, magnetic flow meters, and air release valves, to replace the existing 24-inch ductile iron pipeline. The new pipe will be routed from the existing concentrate well, CW-1, to a piping trench inside the Chemical/Mechanical Building, where it will be connected to an existing 20-inch stainless steel pipe. The piping will be above grade at CW-1 and will be buried from the CW-1 containment pad to the piping trench inside the Chemical/Mechanical Building. (2) A new Hydropneumatic Level Control system, designed by the manufacturer, connected to the buried membrane concentrate pipe. (3) Approximately 1,00 linear feet of 3-inch PVC sump pump drain piping from CW-1 to connect to existing 3-inch PVC drain piping located in the yard outside the Chemical/Mechanical Building. (4) Removal of existing membrane elements, installation of new membrane elements and accessories, start-up, and performance testing for one nano- filtration membrane system (NFMS) treatment train (Train No. 1). Project is included in the City of Sunrise's FY 2022-2026 CIP. As of November 17, 2023, information regarding a design team or a general contractor is not available. Construction is anticipated in FY 2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Award
Water / Sewer
$1,800,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 8, 2023
February 8, 2024
14150 NW 8th St, Sunrise, FL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
