BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a swimming pool in New Orleans, Louisiana. Completed plans call for the renovation of a swimming pool.

The Contractor shall provide all labor, materials, tools, equipment, facilities, supervision, management, financing, services, shop drawings, submittals, testing, and other items necessary for the proper execution and functioning and shall make all Installations and connections necessary, specified, customary, or otherwise appropriate to perform fully and to complete in every respect the contract work generally described as follows: (Specification or drawing references included in the following statement of Subcontract work are applicable but not necessarily all inclusive Stallings Gentilly Pool - 2700 Lapeyrouse: Pool Repair. a. Pool is leaking. b. Leaks have been found and repairs are to be made. Investigate/Repair/Replace. Shell. 1. Shell to be resurfaced with matching materials. 2. Shell to be leak proof. 3. Broken pipes and lines. 4. Broken pipes and lines have been found during the discovery process. 5. Dig down lo pipes. Page 3 of 3 Sourcing Event - ITQ Form February 2020 6. Cut out and remove damaged sections. 7. Install new piping and seal. 8. Backfill. 9. Haul off all debris and spoils. 10. Start and test system. Pool system lo be fully functioning before leaving. Remove all construction debris and dispose off site. Repair any damage caused to site during work performed. All materials, equipment, supplies, fasteners, and other items required to perform work tasks to be supplied and installed by contractor. All trash and debris to be removed by contractor and hauled off. Do not use City dumpster. Clean area when work Is complete. Area to be ready for business use when finished. If any equipment is found to be defective ii is to be identified to owner for approval of repair/replacement. Q and a open: 14 January 2022 22:00:00 The Contractor shall provThe Contractor shall provide all labor, materials, tools, equipment, facilities, supervision, management, financing, services, shop drawings, submittals, testing, and other items necessary for the proper execution and functioning and shall make all Installations and connections necessary, specified, customary, or otherwise appropriate to perform fully and to complete in every respect the contract work generally described as follows: (Specification or drawing references included in the following statement of Subcontract work are applicable but not necessarily all inclusive Stallings Gentilly Pool - 2700 Lapeyrouse: Pool Repair. a. Pool is leaking. b. Leaks have been found and repairs are to be made. Investigate/Repair/Replace. Shell. 1. Shell to be resurfaced with matching materials. 2. Shell to be leak proof. 3. Broken pipes and lines. 4. Broken pipes and lines have been found during the discovery process. 5. Dig down lo pipes. Page 3 of 3 Sourcing Event - ITQ Form February 2020 6. Cut out and remove damaged sections. 7. Install new piping and seal. 8. Backfill. 9. Haul off all debris and spoils. 10. Start and test system. Pool system lo be fully functioning before leaving. Remove all construction debris and dispose off site. Repair any damage caused to site during work performed. All materials, equipment, supplies, fasteners, and other items required to perform work tasks to be supplied and installed by contractor. All trash and debris to be removed by contractor and hauled off. Do not use City dumpster. Clean area when work Is complete. Area to be ready for business use when finished. If any equipment is found to be defective ii is to be identified to owner for approval of repair/replacement. Q and a open: 14 January 2022 22:00:00 Q and a close: 14 January 2022 22:00:00ide all labor, materials, tools, equipment, facilities, supervision, management, financing, services, shop drawings, submittals, testing, and other items necessary for the proper execution and functioning and shall make all Installations and connections necessary, specified, customary, or otherwise appropriate to perform fully and to complete in every respect the contract work generally described as follows: (Specification or drawing references included in the following statement of Subcontract work are applicable but not necessarily all inclusive Stallings Gentilly Pool - 2700 Lapeyrouse: Pool Repair. a. Pool is leaking. b. Leaks have been found and repairs are to be made. Investigate/Repair/Replace. Shell. 1. Shell to be resurfaced with matching materials. 2. Shell to be leak proof. 3. Broken pipes and lines. 4. Broken pipes and lines have been found during the discovery process. 5. Dig down lo pipes. Page 3 of 3 Sourcing Event - ITQ Form February 2020 6. Cut out and remove damaged sections. 7. Install new piping and seal. 8. Backfill. 9. Haul off all debris and spoils. 10. Start and test system. Pool system lo be fully functioning before leaving. Remove all construction debris and dispose off site. Repair any damage caused to site during work performed. All materials, equipment, supplies, fasteners, and other items required to perform work tasks to be supplied and installed by contractor. All trash and debris to be removed by contractor and hauled off. Do not use City dumpster. Clean area when work Is complete. Area to be ready for business use when finished. If any equipment is found to be defective ii is to be identified to owner for approval of repair/replacement. Q and a open: 14 January 2022 22:00:00 Q and a close: 14 January 2022 22:00:00 Q and a close: 14 January 2022 22:00:00

Post-Bid

Swimming Pools

$400,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
49
Bidding Soon
529
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2022

March 1, 2022

img_map_placeholder

2700 Lapeyrouse St, New Orleans, LA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.