BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in New Orleans, Louisiana. Completed plans call for the renovation of a playground / park / athletic field.

The Contractor shall provide all labor, materials, tools, equipment, facilities, supervision, management, financing, services, shop drawings, submittals, testing, and other items necessary for the proper execution and functioning and shall make all installations and connections necessary, specified, customary, or otherwise appropriate to perform fully and to complete in every respect the contract work generally described as follows: (Specification or drawing references included in the following statement of Subcontract work are applicable but not necessarily all inclusive): St. Roch Playground - 1800 St Roch Ave. New Orleans, LA 70117: Playground cover shade is damaged and in need of replacement. (1) Modern Shade Replacement Shade Top, 29'6" X 32' - To include Removal and Disposal of the existing Shade. Remove all construction debris and dispose off site. Contractor should field verify. Repair any damage caused to site during work performed. All materials, equipment, supplies, fasteners, and other items required to perform work tasks to be supplied and installed by contractor. All trash and debris to be removed by contractor and hauled off. Do not use City dumpster. Clean area when work is complete. Area to be ready for business use when finished. If any equipment is found to be defective it is to be identified to owner for approval of repair/replacement. All material shall conform to the latest issue of all applicable standards established by NEMA, and underwriters laboratories, inc. and shall bear manufacturer ' s trade and brand name. Page 3 of 3 Sourcing Event - ITQ Form February 2020 All work shall be installed and completed with the latest rules and regulations of the ASME, NFPA,NEC and all State and local codes and standards and such work not so installed shall be removed and reinstalled at the Contractor ' s expense. Warranties on all furnished equipment and industry standards on parts and labor, all manufacturers warranties should apply. Personal Protective Equipment to be worn at all times and a safe working environment is to be maintained. Q and a open: 14 January 2022 22:30:00 Q and a close: 19 January 2022 22:30:00

Post-Bid

Playgrounds / Parks / Athletic Fields

$50,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
33
Bidding Soon
517
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2022

March 1, 2022

img_map_placeholder

1800 St Roch Ave, New Orleans, LA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.