Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Saanichton, British Columbia. Completed plans call for the renovation of a municipal facility.
The scope of work generally includes: .1 Mechanical work (By Contractor) .1 Dust Collector (Pre-Purchased) .2 Gas-fired Make-Up Air Unit (Pre-Purchased) .3 Ductwork .4 Natural gas piping .5 Air systems balancing .6 Verification of systems operation and controls Demolition and General Trades (By Contractor) .1 Removal and disposal of redundant equipment and ductwork. .2 New concrete housekeeping pads. .3 Painting of gas piping. .4 Disconnection and relocation of woodshop equipment into new locations shown on drawings. Cut new openings in floor for installation of ductwork. .5 Other demolition, painting, remediation, etc. as described in the Specifications and on the drawings, to accommodate the Work. Demolition and General Trades (By Owner; Contractor to Coordinate) .1 Patching of existing openings in floor. .2 Cut and frame new opening in floor for blowback damper access. .3 Demolition of interior storage room, relocation of fixed shelving units, installation of new stairs to mezzanine. .4 Painting of shop floor and safety clearances. Electrical work (By Contractor) .1 Line voltage connection to the dust collector main control panel. .2 Line voltage connection from the dust collector main control panel to the dust collector fan and shaker motor. .3 Bonding wiring to maintain all exposed metallic items in the shop at the same electrical potential. .4 Safety interlocks between dust collector control panel and powered shop equipment. .5 Safety interlocks between shop main breaker panel and power outlets not associated with the dust collector operation. .6 Line voltage connection to the outdoor make-up air unit. .7 Relocation and addition of circuits to feed shop equipment. .8 Supply, installation, and wiring of carbon monoxide detector to fire alarm system. .9 Interconnection to fire alarm if required by Electrical contract documents. Hazardous Materials Work (By Owner; Contractor to Coordinate) .1 The cost of hazardous materials abatement will be covered by the Owner. .2 The Contractor will meet with the Owner and Consultant to identify areas where existing building surfaces will be disturbed. .3 Based on such information the Owner will engage an independent Hazardous Materials Abatement Contractor to prepare openings, etc in advance of the Contractor commencing work.
Post-Bid
Municipal
$100,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 3, 2022
August 15, 2022
2123 Keating Cross Rd, Saanichton, BC
Related To This Project
Saanichton, BC
Bid Date: May 18 2022
Saanichton, BC
Bid Date: May 18 2022
Saanichton, BC
Bid Date: May 18 2022
Saanichton, BC
Bid Date: May 18 2022
Saanichton, BC
Bid Date: May 18 2022
Saanichton, BC
Bid Date: May 18 2022
Saanichton, BC
Bid Date: May 18 2022
Saanichton, BC
--
Saanichton, BC
Bid Date: Apr 29 2022
Saanichton, BC
--
Saanichton, BC
Bid Date: Apr 20 2022
Saanichton, BC
Bid Date: Apr 15 2022
Saanichton, BC
Bid Date: Apr 13 2022
Saanichton, BC
--
Saanichton, BC
Bid Date: Mar 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.