BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Flat Rock, North Carolina. Completed plans call for the renovation of a educational facility.

GENERAL: Henderson County requests proposals to provide a turnkey project inclusive of all labor, materials, traffic control, supervision, disposal fees, permits, inspections to provide and install a new 800-amp electrical sub-panel in the Spearman building on the campus of Blue Ridge Community College. Contractor is to meet or exceed all requirements and specifications outlined in the attached engineered drawings. Work area and equipment room to be left in a clean and good condition o Time of Completion: The awarded Contractor may commence work immediately upon receipt of purchase order. Contractor must be complete by May 31st, 2022. o Contractor must submit a timeline for beginning and completion of the project. o Install all materials and equipment in accordance with Henderson County Electrical code requirements, manufacturer's instructions, and warranty requirements. o Contractor is to obtain and pay for all required permits and inspections. Any deficiencies found in the installation or materials used in the installation which prevents receiving a green tag from inspector and Final inspection will be the Contractor's responsibility and expense to correct. o Contractor will be responsible for all utility disconnections, reconnections including gas, electrical, plumbing, flue, fire alarm systems and Metasys. o Furnish the necessary supervision, labor, tools, equipment, and materials to complete the work outlined in the engineered drawings, RFP, and pre-bid meeting. o Work schedule limitations to be coordinated with the Blue Ridge Community College Project Coordinator. o Project includes disposal of all debris & packing materials offsite at the Contractor's expense. The contractor will not be allowed to use College dumpsters. Construction dumpsters will be the responsibility of the Contractor and at the Contractor's expense. o Contractor will provide traffic flaggers for any road or lane closures needed for delivery of equipment or work to be done. o Daily Cleanup of all affected work areas and paths of entry and material delivery or removal. o Any damage to buildings, walkways, pads, patios, and foliage will be the responsibility of the Contractor to repair or replace at their expense. Last Day for Questions: December 7th, 2021, at 5:00pm. Question must be in written form by email or USPS letter on or before date indicated. Submit all questions to: the BRCC Project Coordinator (Marshallm@blueridge.edu

Award

Educational

$103,510.00

Public - County

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
43
Bidding Soon
661
All Active Projects
311
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

January 17, 2022

img_map_placeholder

150 E Campus Dr, Flat Rock, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.