Site work and renovation of a water / sewer project in West Columbia, South Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Alternate Delivery approach utilized to renovate the existing control building to include; laboratory, filter gallery, storage space, kitchen, office and control room. Project Location: West Columbia South Carolina Below is a preliminary scope of work that may be modified during contract negotiations with the DesignBuild Team. Evaluation of Owner's Criteria - Preliminary evaluation of the existing facility including structural, mechanical, electrical, plumbing, etc. and provide recommendations on constructability, labor, scheduling, and other factors related to project cost. - Prepare written report summarizing Owner's Criteria and project budget goals. Prepare preliminary costs for architectural and engineering services in sufficient detail to determine services provided by each design professional. Preliminary Design - Prepare preliminary scope of work alternatives prioritizing Owner's project goals. - Renovation design including design intent, space requirements, planning criteria, preliminary floor plan, preliminary selection of building systems and materials, utility load review, and code compliance. - Develop preliminary estimate of probable construction cost in sufficient detail to determine quantities of materials, labor, profit, overhead, insurance, etc. for the entire project. - Attend owner and user meetings to coordinate and resolve value engineering, constructability, design and construction scheduling issues during preliminary design. - Conduct design meetings with Owner as needed, not less than three meetings shall be scheduled. - Provide updated design schedule. Detailed Design - Based on work completed during the preliminary design phase, satisfactorily resolve all review comments, and further revise the design to include the following revised and additional information: - Renovation Design: review and confirm floor plan configuration and elevation elements including all building materials and colors, wall systems, overall dimensions, materials testing requirements, mechanical electrical and plumbing systems, equipment, and calculations. - Conduct regular meetings with the Owner as needed, not less than four shall be scheduled. - Develop material and equipment technical specifications. - Review and confirm total original budget from Preliminary Design phase review. Review and propose value engineering items and reconcile variances. - Review, update, and confirm project schedule. - Attend Owner meetings to coordinate and resolve value engineering, constructability, construction phasing and scheduling issues since the preliminary design. Review, Permitting, and Approvals - Present all project plans and specifications to the City's Planning and Building departments and any other regulatory agencies whose approval is necessary for the successful completion of the project. - The City will be responsible for all associated regulatory agency review fees. - Incorporate all necessary regulatory agency comments necessary to obtain the appropriate permits for construction. Final Construction Documents - Resolve all review comments from prior phases and prepare and finalize all construction drawings and specifications to all components necessary for successful construction of the project. - Provide documents necessary for development of a final cost estimate and updated project schedule; reconcile cost estimate with construction estimate. - Incorporate bid alternatives as necessitated by the project budget. - Conduct final design and budget review meeting. Provide guaranteed maximum price of construction. Construction & Construction Administration - Provide construction administration and observation services associated with all construction activities. Conduct monthly construction progress and payment application review meetings. - Provide materials testing and inspection services of an independent testing service to be selected by the Owner. - Coordinate with design professionals for interpretations of the construction documents, review and approval of shop drawings and submittal information, and coordinate with Owner regarding any necessary changes to the work. - Provide all necessary material, labor, equipment, etc. necessary for construction of the project in the manner outlined on the approved final construction drawings. - Prepare as-built documents and submit one hard copy and one electronic copy of all record drawings. - Prepare and submit all necessary documents to applicable regulatory agencies for final approval or certificate of occupancy.

Award

Water / Sewer

$250,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
119
Bidding Soon
1,461
All Active Projects
638
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 21, 2021

February 15, 2022

July 22, 2022

img_map_placeholder

Multiple Locations, West Columbia, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.