BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Vernon Hills, Illinois. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; laboratory facility; laboratory facility; laboratory facility; and laboratory facility.

Trade Packages include; 03A-1 Building Concrete, 04A-1 Masonry, 05A-1 Structural Steel, 06A-1 General Trades, 07A-1 Roofing, 08B1 Aluminum, Glass, and Glazing, 09A-1 Drywall, 09D-1 Acoustical Ceiling, 09F-1 Flooring, 09G-1 Painting, 21A-1 Fire Protection, 22A-1 Plumbing, 23A-1 HVAC, 23B-1 Test and Balance, 26A-1 Electrical, and 31A-1 Excavation. All Contractors shall use the bid day label provided with their Bid Form. SCOPE OF WORK : The project consists of work at two existing schools as follows: 1. Middle School South: 6,700 SF addition that includes new Music, Band, and Practice Rooms; and 5,110 SF of renovation work that includes Music/Choir Rooms, and STEAM Labs. Alternates include 11,000 square feet of renovations in the existing Locker Rooms, Kitchen, and Main Office. 2. Aspen Elementary: Mechanical system upgrade in an existing classroom wing, with associated floor and ceiling finish upgrades. Alternates include new lighting in an existing classroom wing, replacement of existing clerestory glazing systems, and re-roofing work at an existing entrance. INSTRUCTIONS TO BIDDERS Prospective bidders should contact Lamp Incorporated (Kari Christensen, kchristensen@lampinc.net, 847-741-7220 x315) to be placed on the bid list. Contractors' qualification statements are due in Lamp Incorporated's office by 5:00 pm, Monday, December 13, 2021. All Performance and Payment Bonds will be in accordance with the requirements stated in the AIA 232 General Conditions. Payment of Prevailing Wages is required for this project. This Project is Tax Exempt. The Board of Education of Hawthorn School District 73 reserves the right to reject any and all proposals or waive any bid irregularities. It is strongly urged that all bidders attend this meeting to fully understand the project requirements. Bidders failing to demonstrate a thorough understanding of the project and the existing conditions at the scope review may be rejected.

Post-Bid

Educational

$600,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
128
Bidding Soon
2,074
All Active Projects
881
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

January 13, 2022

img_map_placeholder

Multiple Locations, Vernon Hills, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.