BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a water / sewer project in Conroe, Texas. Completed plans call for the demolition of a water / sewer project; for site work for a water / sewer project; and for the construction of a water / sewer project.

The project generally consists of construction of new potable water distribution system booster pump station buildings and associated piping and electrical improvements. Project will be constructed under up to two (2) prime contracts. Demolition and replacement of booster pump station buildings, including the relocation of booster pumps, chemical storage, containment, and feed equipment, and associated electrical and instrumentation. South Texas (South Texas Bid Package) Locations- Decker Hills 2 Holiday Village Ivanhoe 2 Ivanhoe 4 North/East Texas (North Texas Bid Package) Locations- Metroplex Homesteads 1 Metroplex Homesteads 2 Metroplex Homesteads 3 Metroplex Homesteads 4 Metroplex Homesteads 5 Westwood Beach 3 The Owner reserves the right, after evaluation of all bids received, to make no recommendation regarding the award of any bid in the even non-responsive, non-conforming, or otherwise unacceptable bids are received, or if budgetary constraints or other unanticipated factors exist. No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. 1. The project generally consists of, but is not necessarily limited to, the replacement of ten (10) booster pump buildings, connection to existing process piping, relocation of existing booster pumps, chemical storage, containment, and feed; and associated site civil, miscellaneous yard piping, electrical, and instrumentation and controls. 2. The Work includes the following items: a. Clearing as required to complete the work. b. Trench safety systems, groundwater dewatering, shoring, sheet piling, and earthwork required. c. Site work, including clearing, stripping, grading, excavating, backfilling, compacting, seeding, sodding, and paving. d. Demolition of existing booster pump buildings. e. Prior to final walk-through the Contractor shall clean dirt and construction debris from the facilities including building electrical manholes and MCCs, walkways, and vaults and shall clean and touch-up paint all painted items. f. Other facilities and services necessary for proper execution and completion of this Project.

Post-Bid

Water / Sewer

$150,000.00

Public - County

Demolition, New Construction, Site Work

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
54
Bidding Soon
2,711
All Active Projects
1,114
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

January 17, 2022

img_map_placeholder

Multiple Locations, Conroe, TX


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.