BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2022 at 7:00 PM

Updated January 29, 2024

Site work and new construction of a municipal facility in Livingston, Montana. Conceptual plans call for the construction of a municipal facility.

The transfer station receives hundreds of tons of green waste every year. The volume that is able to be processed into compost is minimal with the capacity of the WRF composting operation. In addition, excess material must be burned or is deposited at the Swingley property. The WRF is not able to utilize all of its biosolid waste into compost at this time and pays to have it removed to the landfill. A composting facility would utilize more of the biosolids waste from the WRF, as well as the large quantity of green waste, in an effective manner so that carbon and nitrogen may be balanced properly, to create a sellable compost product. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of January 17, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Municipal

$527,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
14
Bidding Soon
135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 2, 2023

Project location map

To Be Determined, Livingston, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.