BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Morton Grove, Illinois. Completed plans call for the renovation of a educational facility.

Bids received after the designated time and date of Bid opening will not be considered. 2. Bid Security in the form of a bid bond, certified check, or cashier's check in amount equal to ten percent (10%) of the Base Bid must be submitted with the Bid. Owner reserves the right to reject any and all Bids or parts thereof, to waive any irregularities or informalities in bidding procedures, and award the Contract in a manner best serving the interest of the School District. 1. Roof Replacement at Park View School, Roof Areas 15 and 17, Morton Grove, Illinois. The Project Base Bid Work generally consists of replacement of roofing, as follows: 1. Roof Area 15: a. Removal and legal disposal of existing roof system, insulation and related flashings down to existing gypsum deck; b. Providing a nailed base sheet, mechanically attached; c. Providing a 2-ply substrate membrane in hot asphalt; d. Providing 2 layers of 2.6-inch polyisocyanurate insulation, adhered; e. Providing a 1/2-inch high-density coverboard, set in adhesive; f. Providing 60-mil fully-adhered EPDM single-ply roof membrane; g. Providing new prefinished sheet metal flashings at perimeters of roof area and at projections, as required. 2. Roof Area 17: a. Removal and legal disposal of existing roof system, insulation and related flashings down to existing gypsum deck; b. Providing a nailed base sheet, mechanically attached; c. Providing a 2-ply substrate membrane in hot asphalt; d. Providing 2 layers of 2.6-inch polyisocyanurate insulation, adhered; e. Tapered polyisocyanurate insulation; f. Providing a 1/2-inch high-density coverboard, set in adhesive; g. Providing 60-mil fully-adhered EPDM single-ply roof membrane; h. Providing new prefinished sheet metal flashings at perimeters of roof area and at projections, as required.

Post-Bid

Educational

$410,000.00

Public - City

Renovation

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
127
Bidding Soon
1,999
All Active Projects
887
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

June 6, 2022

img_map_placeholder

6200 Lake St, Morton Grove, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.