Site work for a water / sewer project in Cameron, Missouri. Completed plans call for site work for a water / sewer project.

Custom BT Bid Package 1 BRB Contractors, Inc 32,039,051 Bid Package 2 Irvinbilt Constructors, Inc 3,247,300 Bid Package 3 Caldwell Tanks 1,778,400 The Project consists of constructing 18-inch, 16-inch, and 6-inch pipelines with appurtenances, and two master meter vaults. Bidding Documents may be obtained from the Issuing Office during the hours indicated above. Bidding Documents are available on a removable hard drive (as portable document format (PDF) files) for a non-refundable charge of $30, including shipping via overnight express service. Alternatively, printed Bidding Documents may be obtained from the Issuing Office either via in-person pick-up or via mail, upon Issuing Office's receipt of payment for the Bidding Documents. The non-refundable cost of printed Bidding Documents is $125 per set, payable to "Great Northwest Wholesale Water Commission." plus a non-refundable shipping charge. Upon Issuing Office's receipt of payment, printed Bidding Documents will be sent via the prospective Bidder's delivery method of choice; the shipping charge will depend on the shipping method chosen. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any obtained from sources other than the Issuing Office. Bid security shall be furnished in accordance with the instructions to Bidders. The Work will be substantially completed within 458 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 548 days after the date when the Contract Times commence to run. Job No. 20172062

Bid Results

Water / Sewer

$37,064,751.00

Public - City

Site Work

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
30
Bidding Soon
670
All Active Projects
293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2021

January 18, 2022

img_map_placeholder

Multiple Locations, Cameron, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.