Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 15, 2025 at 8:00 PM
Updated July 16, 2025
Site work and new construction of a pre-engineered storage facility in Dublin, Ohio. Conceptual plans call for the construction of a pre-engineered storage facility.
Update: The City currently has two 2,000 ton salt barns. This project would build storage with a capacity of 10 to 12 thousand tons. This capacity will ensure ample salt supplies during harsh winters. Design took place in 2024 and construction is programmed for 2026. The type, number and layout of the structure(s) have yet to be determined. Small repairs are being made to the current structures to keep them operational. This request also accounts for a new brine system for snow events. The new system will allow for better tracking of salt usage, which will help the city reduce salt waste during snow events and ultimately reduce costs. The existing limited capacity of the salt barns necessitates frequent refilling during the snow removal season when demand for salt is at its peak. A higher capacity barn will help to ensure that the City has adequate supplies and will enable purchases to occur when salt prices are favorable. The brine system is important to help monitor the use of salt during snow events to limit potential waste and enable more environmentally-friendly treatment practices. Project is included in City of Dublin Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project is included in the City of Dublin's fiscal year 2024-2028 Capital Improvement Plan (CIP). As of December 8, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however, funding is allotted to fiscal year 2025. A detailed scope has not yet been released. The City currently has two 2,000 ton salt barns. This project would build storage with a capacity of 10 to 12 thousand tons. This capacity will ensure ample salt supplies during harsh winters. The type, number and layout of the structure(s) has yet to be determined. Small repairs are being made to the current structures to keep them operational. This request also accounts for a new brine system for snow events. The new system will allow for better tracking of salt usage, which will help the city reduce salt waste during snow events and ultimately reduce costs. The existing limited capacity of the salt barns necessitates frequent refilling during the snow removal season when demand for salt is at its peak. A higher capacity barn will help to ensure that the City has adequate supplies and will enable purchases to occur when salt prices are favorable. The brine system is important to help monitor the use of salt during snow events. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Warehouse / Distribution - Pre-Engineered Storage Building
$1,000,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
