Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Site work for a water / sewer project in Dublin, Ohio. Conceptual plans call for site work for a water / sewer project.

Update: This project will construct a 30-inch diameter sanitary relief sewer along Glick Road between the Dumfries Court lift station and Dublin Road and along Dublin Road between Glick Road and the Deer Run pump station. The need for this project was identified in the Deer Run Sanitary Sewer Modeling Report from 2012 and the Sanitary Sewer Modeling Update from 2019. Providing this improvement will increase system capacity and reduce the occurrences of sanitary sewer overflow and water in basement events in the Deer Run sanitary sewer collection system. This will also help to fulfill the obligation of the Director's Final Findings and Orders from the Ohio EPA. Preliminary design for the project began in 2023 and detailed design began in 2024. Site acquisitions for the project are planned for 2025, if necessary. The construction of the project is planned for 2026, pending site acquisitions, if necessary. Project is included in City of Dublin Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project is included in the City of Dublin's fiscal year 2024-2028 Capital Improvement Plan (CIP). As of December 8, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however, funding is allotted to fiscal year 2025. A detailed scope has not yet been released. This project will construct a 30-inch and 18-inch diameter sanitary sewer main downstream of Dumfires Court along Glick Road and south on Dublin Road. The need for this project was identified in the Deer Run Sanitary Sewer Modeling Report from 2012 and the Sanitary Sewer Modeling Update from 2019. Providing this improvement will increase system capacity and reduce the occurrences of sanitary system overflow and water in basement events in the Deer Run sanitary system. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$6,540,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
154
Bidding Soon
2,065
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.