BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 8, 2022 at 7:00 PM

Updated November 14, 2023

Site work and paving for a mixed-use development in New Albany, Indiana. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Silver Creek Kayak Launch A new kayak launch will be constructed at Providence Landing to provide access to Silver Creek for nonmotorized watercraft. Concrete sidewalks, ramps, and steps will descend the hillside beneath the Spring Street bridge over Silver Creek. Project elements also include gabion and concrete retaining walls, rip rap and erosion control methods, landscaping, metal fabricated steps, handrailing, and a boat assist rail. The Work will be substantially completed on or before November 1 st, 2022; Final completion on or before December 1 st, 2022.

Award

Water / Sewer

$965,000.00

Public - City

Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
146
Bidding Soon
1,680
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

January 13, 2022

Project location map

To Be Determined, New Albany, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.