BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 7, 2021 at 7:00 PM

Updated March 22, 2024

Renovation of an educational facility in Deming, New Mexico. Completed plans call for the renovation of a educational facility.

Western New Mexico University 1360 W. Florida Street, Deming, NM 88030 1. A new 25,000 +/- s.f. education building with an overall budget of $8.5M located at 2300 E. Pine, Deming, NM 88061. The project will be phased with Phase 1 to include site and utility rough ins. Phase 2 will include (2) subphases; Phase 2A, which includes finishing out nursing suite and shelling the remainder of the building, and Phase 2B, which includes finishing out the rest of the building. Phase 3 includes the construction of a new, 2 story classroom wing, an interior renovation that includes the construction of 2 bathrooms, and the construction of a vocational training wing comprised of 2 welding shops, and a second story testing suite. 2. Sustainable/"Green" Requirements: The building(s) on the site and the sitework adjacent to the building(s) are designed and shall be constructed to a Silver Level under LEED-NC v4 program and SITES certification of USGBC/GBCI, but will not be registered.. The requirements for sustainable/"green" construction are contained throughout the Contract Documents and in particular are specified in Section 01 81 13- Sustainable Design Requirements. Project includes the construction of a new building on a vacant site. The scope of Phase 2 is divided into two concurrent construction projects. Phase 2 A includes the completed construction a 4,000sf nursing suite, and the construction of an 8,600sf unoccupied shell to be finished as part is Phase 2B. Shell space shall include weatherproof barrier, with reduced mechanical, electrical, plumbing, and fire protection. DBE Subcontractors and Suppliers are strongly encouraged to respond. Direct any questions to Bradbury Stamm Construction at (505) 765-1200. The Deming Gateway Building project is scheduled to begin in January 2022 and is scheduled to be complete in December 2022 *Addendum 1 for phase 2 has been released.

Post-Bid

Educational

$600,000.00

Public - State/Provincial

Renovation

186

31

20

2

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
10
Bidding Soon
174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

January 19, 2022

Project location map

1360 W Florida St, Deming, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.