BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 7, 2021 at 7:00 PM

Updated November 15, 2023

Site work, paving and renovation of a mixed-use development in Pontotoc, Mississippi. Completed plans call for the renovation of a educational facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This package contains 3 school sites for bid that will be awarded to a single Contractor. A separate project will be under construction during the same construction period as this project. Coordination between both projects will be required. The work is funded by ESSER (Elementary and Secondary School Emergency Relief) Federal Funding. 1. Pontotoc High School includes renovations in 2 separate areas: a. An unfinished space renovation includes interior wall construction, floor installation, some ceiling grid, ceiling paint, wall paint, door installations, lighting, and an egress stair installed. b. A set of toilet rooms at the main school building will be renovated, which includes demo, rough in plumbing, new tile floors, some metal stud framing with backer and tile, walls paint, toilet fixtures and accessories, as well as lighting and ceiling work. 2. Pontotoc Junior High School includes renovations in 3 separate areas: a. An ADA ramp shall be installed including painted steel guardrails, poured in place concrete retaining walls and ramps, some storm sewer work, and regrading on the exterior between the main school and the gym. b. At the upper Gym floor and in the northern section of the building, a full renovation of the space shall occur, including asbestos remediation, new flooring and ceilings, tile work, plumbing fixtures and accessories, as well as paint and lighting. At the gym, an area shall be reframed for ADA viewership at the existing benches. The existing benches shall be repaired and painted. The gym shall also receive new paint and lighting as well as flooring. Window repair work and/or new window installations shall occur throughout. 3. Pontotoc Middle School includes renovations at the upper floor of the auditorium. Renovation includes new ADA ramps, new storefront, new ceilings and floors, as well as lighting and window repairs. Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 90 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. The owner reserves the right to postpone action and final decision for a period of up to ninety (90) days Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work thirty (30) days after the Contract Substantial Completion date of July 15, 2022, for construction. Work is subject to liquidated damages. Contact regarding questions, email biddinginfo@dalepartners.com SDG Project No. 2021-289.00 TPS PROJ. # 21222 PICKERING PROJECT NO.: 26076.00

Post-Bid

Educational

$100,000.00

Public - City

Paving, Renovation, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

January 17, 2022

Project location map

Multiple Locations, Pontotoc, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.