BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction, remodeling, renovation and addition to an educational facility in Ralston, Nebraska. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the construction of a educational facility; for the remodel of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Ralston Public Schools is requesting proposals from qualified construction management firms (CM) to provide construction management at risk services for an Elementary School Facilities Improvement Project, including without limitation construction of a new elementary school building at the Mockingbird Elementary site; addition, remodel, reconstruction, and/ or modification of the elementary school buildings at each of the Meadows Elementary, Wildewood Elementary, and Blumfield Elementary sites; site improvements at each location identified above; and demolition of the existing elementary school building at the Mockingbird Elementary site. The construction cost budget, is approximately $34,749,294 to $39,961,688 The total Project budget is approximately $40,304,271 to $46,349,912 Scope and Nature. This Elementary School Facilities Improvement Project will likely include without limitation construction of a new elementary school building at the Mockingbird Elementary site; addition, remodel, reconstruction, and/or modification of the elementary school buildings at each of the Meadows Elementary, Wildewood Elementary, and Blumfield Elementary sites; site improvements at each location identified above; and demolition of the existing elementary school building at the Mockingbird Elementary site. See enclosed Project Overview. It is anticipated that the Project will progress and be completed in stages, as follows: (1) Phase 1 consisting of construction of a new elementary school building and site improvements at the Mockingbird Elementary site; (2) Phases 2-4 consisting of addition, remodel, reconstruction, and/or modification of the elementary school buildings at each of the Meadows Elementary, Wildewood Elementary, and Blumfield Elementary sites and site improvements to the same; and (3) Phase 5 consisting of demolition of the existing elementary school building at the Mockingbird Elementary site. During the anticipated Phases 2-4, summarized above, the student and staff populations for each such respective elementary school site under construction will be temporarily relocated to the currently existing Mockingbird Elementary. The specific elementary schools that are within Phases 2-4 respective, and the order in which each Phase progresses will be determined after a CM is selected and it is anticipated that the successful CM will provide input to that planning decision. B. Sites. (1) Mockingbird Elementary School, 5100 South 93rd Street Omaha, NE 68127; (2) Meadows Elementary School, 9225 Berry Street Omaha, NE 68127; (3) Wildewood Elementary School, 8071 Ralston Avenue Ralston, NE 68127; and (4) Blumfield Elementary School, 10310 Mockingbird Drive Omaha, NE 68127.

Award

Educational

$46,349,912.00

Public - City

Addition, Demolition, New Construction, Remodeling, Renovation, Site Work

13

3

4

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
44
Bidding Soon
478
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2021

October 3, 2022

img_map_placeholder

Multiple Locations, Ralston, NE

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.