Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 11, 2022 at 7:00 PM
Updated November 15, 2023
Site work for a water / sewer project in Berkeley, California. Completed plans call for site work for a water / sewer project.
Scope of Work: The work to be done consists of, but is not limited to: a) CIPP lining (Method "A") of approximately 376 linear feet of 6-inch diameter sanitary sewer main. b) CIPP Lining (Method "A") of approximately 1,622 linear feet of 8-inch diameter sanitary sewer mains. c) Pipe-bursting (Method "B") rehabilitation of approximately 114 linear feet of 6-inch and 8-inch diameter sanitary sewer mains d) Pipe-bursting (Method "B") rehabilitation of approximately 1,145 linear feet of 10- inch diameter sanitary sewer mains. e) Traditional Open-trench (Method "C") replacement of approximately 340 linear feet of 4-inch, 6-inch, and 8-inch diameter sanitary sewer mains. f) Traditional Open-trench (Method "C") replacement of approximately 170 linear feet of 10-inch diameter sanitary sewer main. g) Traditional Open-trench (Method "C") replacement of approximately 607 linear feet of 18-in diameter sanitary sewer main. h) Traditional Open-trench (Method "C") replacement of approximately 55 linear feet of 4-inch, 6-inch, and 8-inch diameter sanitary sewer main. i) Replacement of approximately 187 linear feet of 4-inch and 6-inch diameter sanitary sewer laterals j) Construction and rehabilitation of maintenance holes including excavation and related work. The project will include pre-cast concrete and fiberglass reinforced (FRP) maintenance holes. k) All of the work sites are located within City of Berkeley Fire Zone 2 and are subject to restriction imposed during the Red-Flag warnings. l) Many of the work sites are located on private properties with limited access. California Contractor's License Required: A General Engineering, or C-34 Pipeline, or C-42 Sanitation System. The work is located at Grizzly Peak Boulevard, Euclid Avenue, Cragmont Avenue, Wildcat Canyon Road, Woodhaven Road, Keeler Avenue, Spruce Street, and Eunice Street in Berkeley, CA. Questions concerning the anticipated work or scope of the project should be directed to the following Public Works Department staff, no later than 12:00 PM, Friday, December 10, 2021. Daniel Akagi, Supervising Civil Engineer, dakagi@cityofberkeley.info, (510) 981-6394 Engineering Division, 1947 Center Street, 4th Floor, Berkeley, CA 94704, (510) 981-6400. Grizzly Peak Boulevard Backline, Euclid Avenue Backline, Cragmont Avenue Backline, Euclid Avenue, Wildcat Canyon Road, Woodhaven Road,Keeler Avenue, Spruce Street, and Eunice Street
Bid Results
Water / Sewer
$1,618,963.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
