BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Colorado Springs, Colorado. Completed plans call for site work for a water / sewer project.

Final day for questions Wednesday, December 22, 2021 The Widefield Water and Sanitation District (Owner or WWSD) is seeking a qualified Construction Manager (CM) to provide Construction Manager at Risk (CMAR) services including preconstruction services and complete construction services for the Upper West to East (UW2E) Water Transmission Line project. The selected CMAR will work as a team with the designer of record and Owner staff to ensure an efficient design approach for the project. The purpose of this Request for Qualifications (RFQ) is to identify interested CM's with qualifications to meet the needs of the Owner and financial capacity to provide CMAR services during the project. Based on qualifications included in a responsive Statement of Qualifications (SOQ), the Owner's selection committee will select the best qualified firms to establish a short list of firms. These firms will be invited to provide a price proposal based on a Request for Proposal after Owner's review of the SOQ's. Final selection of a CMaR is anticipated to occur at the end of January 2022, with the start of preconstruction services to occur in February 2022 or earlier, as determined by the Owner. The proposed UW2E project will install a new 24-inch water transmission main from Booster Pump Station #2 to the existing Joint Use Tank Farm. The proposed UW2E waterline will travel north to Fontaine Blvd, west along Fontaine Blvd, and south to the Joint Use Tank Farm. Timely completion of the UW2E waterline in the fall of 2022 is a priority for WWSD to meet growing demand in the future. Work may be completed in separate construction packages depending on the schedule for obtaining necessary easements, materials, and labor. General Requirements - Insurance Required - Contractors License Required

Post-Bid

Water / Sewer

$8,000,000.00

Public - City

Site Work

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
30
Bidding Soon
665
All Active Projects
284
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2022

May 13, 2022

img_map_placeholder

Multiple Locations, Colorado Springs, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.