Site work for a water / sewer project in Saratoga Springs, Utah. Completed plans call for site work for a water / sewer project.

Saratoga springs marina jetty install light pole foundations conduit conveyance pipe dredge harbor re-route discharge point utah lake Marine transport including boats and motors and commercial marine craft and safety and rescue watercraft and military watercraft and recreational watercraft and docks and piers, fixed and floating Electrical wire and cable and harness including conduit and fittings and circuit breakers Pipe piping and pipe fittings including adapters and angle face rings and backup flanges and baffles and bends and bushings and caps and connectors Question Submission Close Date 1/26/2022 12:00 PM MST QUESTIONS All questions relative to the project shall be submitted through the SciQuest bidding site/Utah Public Procurement Place (U3P). Questions will be accepted until 12:00 pm, Wednesday, January 26, 2022. All response A Bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder's maximum Bid price and in the form of a certified check or a Bid bond The OWNER reserves the right to reject any or all bids; or to accept or reject the whole or any part of any bid; or to waive any informality or technicality in any bid in the best interest of the City. Only bids giving a firm quotation properly signed will be accepted Approximately 870 linear feet of a new jetty. Install light pole foundations and conduit along new jetty, as well as conveyance pipes. Dredge inner harbor created by new jetty and existing jetty. Rerouting of existing conveyance pipe to new discharge point into Utah Lake Project number - 360.11.300 The following portions of the Work shall be substantially completed on or before February 28, 2022 The remaining portions of the Work, except for asphalt paving, shall be substantially completed within 120 working days after Notice to Proceed and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions after an additional 10 days.

Bid Results

Water / Sewer

$3,229,636.00

Public - City

Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
54
Bidding Soon
1,021
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2022

April 4, 2022

Project location map

1566 Harbor Park Way, Saratoga Springs, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.