BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Early, Texas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For Ps&e Package Questions Call: Jordan Perry 906 E Main St Eastland, Tx 76448 254/629-6313 Length: 0.01mi Time for Completion: 225 Working Days County Control Limits From Highway Project Limits to Comanche0923-17-088CR 340 at Leon River Crbr 2021(887). Length: Miles Comanche0923-17-080CR 103 at Sweetwater Creek Crbr 2020(925). Length: 0 Miles Comanche0923-17-086CR 4981 at Leon River Draw Crbr 2b20(088). Length: 0.10 Miles TXDOT - Bridge Replacement BR 2B20(088)

Award

Bridges / Tunnels

$1,969,718.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
24
Bidding Soon
471
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2022

March 8, 2022

Project location map

To Be Determined, Early, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.