BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a bridge / tunnel in St George, Utah. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The project includes furnishing all labor, materials, transportation, and services to install two pre-fabricated pedestrian bridge sections (one 130' span and one 75' span), including construction of concrete abutments, center pier, wing walls, and drilled shafts, as well as construction of approximately 400 linear feet of all-weather access trail. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Bridges / Tunnels

$492,164.00

Public - County

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
13
Bidding Soon
145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2021

January 13, 2022

Project location map

2099 S Convention Center Dr, St George, UT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.